| Line 19: | Line 19: | 
|  | ;f':Design infiltration rate (length per time, usually mm/hr) after application of safety correction factor (SCF) |  | ;f':Design infiltration rate (length per time, usually mm/hr) after application of safety correction factor (SCF) | 
|  |  |  |  | 
| − | ;h :height (units of length) | + | ;h :Height (units of length) | 
|  |  |  |  | 
|  | ;i :Intensity of the design storm event (in units of depth/time, usually mm/hr) |  | ;i :Intensity of the design storm event (in units of depth/time, usually mm/hr) | 
| Line 29: | Line 29: | 
|  | ;L :Length, e.g. of a reach, channel or swale (usually in m) |  | ;L :Length, e.g. of a reach, channel or swale (usually in m) | 
|  |  |  |  | 
| − | ;m :run of side slopes in channel cross sections (length, but usually expressed as a ratio in relation to rise. e.g. side slopes = 1:3, so m = 3) | + | ;m :Run of side slopes in channel cross sections (length, but usually expressed as a ratio in relation to rise. e.g. side slopes = 1:3, so m = 3) | 
|  |  |  |  | 
|  | ;n :Porosity, applies to aggregate and other void-forming materials, filter media and native soils (unit is vol/vol, so dimensionless) |  | ;n :Porosity, applies to aggregate and other void-forming materials, filter media and native soils (unit is vol/vol, so dimensionless) | 
| Line 39: | Line 39: | 
|  | ;Q<sub>p</sub> :Peak flow in units of volume per time (e.g. m<sup>3</sup>/s) |  | ;Q<sub>p</sub> :Peak flow in units of volume per time (e.g. m<sup>3</sup>/s) | 
|  |  |  |  | 
| − | ;R :Ratio of catchment (A<sub>c</sub>) to the practice footprint area (A<sub>p</sub>). ''syn.'' I/P ratio. For [[green roofs]](and often permeable paving systems) this will be1:1.In [[bioretention]] itmay be 15or 20to 1. | + | ;R :Ratio of catchment impervious area (A<sub>i</sub>) to the practice footprint area (A<sub>p</sub>). ''syn.'' I/P ratio. For [[green roofs]] and often [[permeable paving]] systems that do not receive drainage from external impervious areas this will be 0. For [[bioretention]], [[infiltration trenches]] and [[infiltration chambers]] receiving pavement runoff, it is recommended to be kept between 15 to 20.    | 
|  |  |  |  | 
|  | ;R<sub>a</sub> :Existing rise of swale gradient (length, usually m) |  | ;R<sub>a</sub> :Existing rise of swale gradient (length, usually m) |