Difference between revisions of "Permeable pavements: Gallery"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| Line 12: | Line 12: | ||
| Downloading.JPG|Inspection [[wells]] should be located at the edges or even off the side of permeable pavement areas | Downloading.JPG|Inspection [[wells]] should be located at the edges or even off the side of permeable pavement areas | ||
| IMAX water quality sampling (2).JPG|Water quality sampling in permeable pavement study, Mississauga ON | IMAX water quality sampling (2).JPG|Water quality sampling in permeable pavement study, Mississauga ON | ||
| − | |||
| perviousconcrete.png|Pervious concrete walkway plaza (Source: Villanova Urban Stormwater Partnership) | perviousconcrete.png|Pervious concrete walkway plaza (Source: Villanova Urban Stormwater Partnership) | ||
| PICPDouble.png|PICP on a road with concrete edge restraints separating the impervious and permeable pavements (source STEP) | PICPDouble.png|PICP on a road with concrete edge restraints separating the impervious and permeable pavements (source STEP) | ||
Revision as of 14:30, 13 August 2020
- Permeable pavers in parking bays, Mississauga ON (note inspection of bioretention occurring in the background) 
- Inspection wells should be located at the edges or even off the side of permeable pavement areas 













