Changes

Jump to navigation Jump to search
Line 143: Line 143:  
==Performance==
 
==Performance==
 
{|class="wikitable"
 
{|class="wikitable"
|+Ability of Permeable Pavements to Meet Stormwater Management Objectives
+
|+Ability of Bioretention to Meet Stormwater Management Objectives
 
|-
 
|-
 
!BMP
 
!BMP
Line 150: Line 150:  
!Erosion Control
 
!Erosion Control
 
|-
 
|-
|'''Permeable pavement with no underdrain'''
+
|'''Bioretention with no underdrain'''
 
|Yes
 
|Yes
 
|Yes-size for water quality storage requirement
 
|Yes-size for water quality storage requirement
 
|Partial-based on available storage volume and native soil infiltration rate
 
|Partial-based on available storage volume and native soil infiltration rate
 
|-
 
|-
|'''Permeable pavement with underdrain'''
+
|'''Bioretention with underdrain'''
|Partial-based on available storage, native soil infiltration rate and if a flow restrictor is used
+
|Partial-based on available storage volume beneath the underdrain and soil infiltration rate
 
|Yes-size for water quality storage requirement
 
|Yes-size for water quality storage requirement
|Partial-based on available storage, native soil infiltration rate and if a flow restrictor is used
+
|Partial-based on available storage volume beneath the underdrain and soil infiltration rate
 
|-
 
|-
|'''Permeable Interlocking Pavements'''
+
|'''Bioretention with underdrain and impermeable liner'''
|No-some volume reduction occurs through evaporation
+
|Partial-some volume reduction through evapotranspiration
 
|Yes-size for water quality storage requirement
 
|Yes-size for water quality storage requirement
|Partial-based on available storage volume and if a flow restrictor is used
+
|Partial-some volume reduction through evapotranspiration
 
|}
 
|}
   Line 254: Line 254:  
|-
 
|-
 
|}
 
|}
      
==See also==
 
==See also==

Navigation menu