| Line 1: | Line 1: | 
| − | Turf reinforcement mats (TRM) may be required in swales which are designed to convey higher velocity events.  Most TRM are made of synthetic fibres and intended as a permanent part of the construction (unlike a temporary [[Erosion control blankets|ECB]]). | + | <p>Turf reinforcement mats (TRM) may be required in swales which are designed to convey higher velocity events.  Most TRM are made of synthetic fibres and intended as a permanent part of the construction (unlike a temporary [[Erosion control blankets| erosion control blanket]]).    | 
| − | *Mats should be applied with soil fill technique:
 | + | Mats should be applied with soil fill technique: | 
| − | **Grade the swale and smooth the top soil, removing any debris and large rocks,
 | + | <ol> | 
| − | **Seed with turf grass mixture,
 | + | <li>Grade the swale and smooth the top soil, removing any debris and large rocks,</li> | 
| − | **Dig 150 mm anchor trench at the top of the channel,
 | + | <li>Seed with turf grass mixture,</li> | 
| − | **Secure blanket into the trench with staples every 300 mm. Backfill and compact soil into the trench,
 | + | <li>Dig 150 mm anchor trench at the top of the channel,</li>  | 
| − | **Unroll mat in the direction of flow. Staple as recommended by manufacturer,
 | + | <li>Secure blanket into the trench with staples every 300 mm. Backfill and compact soil into the trench,</li> | 
| − | **Overlaps should be 150 mm and stapled. Upstream mat should always overlay the downstream mat,
 | + | <li>Unroll mat in the direction of flow. Staple as recommended by manufacturer,</li> | 
| − | **Anchor the bottom end of the channel in a similar fashion to the top,
 | + | <li>Overlaps should be 150 mm and stapled. Upstream mat should always overlay the downstream mat, </li> | 
| − | **Apply 15-20 mm of topsoil over the TRM, without the use of heavy machinery which can tear the mat and/or compact the soil, 
 | + | <li>Anchor the bottom end of the channel in a similar fashion to the top, </li> | 
| − | **An [[Erosion control blankets|ECB]]  may be applied to protect the surface through the first one or two years,
 | + | <li>Apply 15-20 mm of [[topsoil]] over the TRM, without the use of heavy machinery which can tear the mat and/or compact the soil, </li> | 
| − | **Irrigate until turf grass is established.
 | + | <li>An [[Erosion control blankets| erosion control blanket]]  may be applied to protect the surface through the first one or two years, </li> | 
| − |   | + | <li>Irrigate until turf grass is established. </li> | 
|  | + | </ol> | 
|  | [[category: materials]] |  | [[category: materials]] |