Difference between revisions of "Infiltration"
Jenny Hill (talk | contribs)  | 
				Jenny Hill (talk | contribs)   | 
				||
| Line 1: | Line 1: | ||
__NOTOC__  | __NOTOC__  | ||
| − | <p>Infiltration of stormwater into underlying soils is one the priority level 1. mechanisms to achieve MOECC Runoff Volume Control targets.   | + | <p>Infiltration of stormwater into underlying soils is one the priority level 1. mechanisms to achieve MOECC Runoff Volume Control targets.</p>  | 
{{TextBox|1= Infiltration is promoted through a number of LID BMPs:  | {{TextBox|1= Infiltration is promoted through a number of LID BMPs:  | ||
| − | + | <ul>  | |
| − | + | <li>[[Infiltration chambers]] (underground)</li>  | |
| − | + | <li>[[Infiltration trenches]] (underground)</li>  | |
| − | + | <li>[[Dry ponds]] (surface)</li>  | |
| − | + | <li>[[Bioretention cells]] (surface)</li>  | |
| − | + | <li>[[Bioswales]] (surface)</li>  | |
| − | </  | + | </ul>}}  | 
===Constraints===  | ===Constraints===  | ||
Infiltration practices are not recommended:  | Infiltration practices are not recommended:  | ||
| Line 22: | Line 22: | ||
<p>  | <p>  | ||
===Designing within constraints===  | ===Designing within constraints===  | ||
| − | Infiltration can still be optimized over 'tight' soils with infiltration rates ≤ 15 mm/hr:  | + | {{TextBox|1= Infiltration can still be optimized over 'tight' soils with infiltration rates ≤ 15 mm/hr:  | 
<ul>  | <ul>  | ||
<li>[[Bioretention: Internal water storage |Bioretention with internal water storage]]</li>  | <li>[[Bioretention: Internal water storage |Bioretention with internal water storage]]</li>  | ||
<li>[[Bioretention:_Partial_infiltration|Partially infiltrating bioretention]]</li>  | <li>[[Bioretention:_Partial_infiltration|Partially infiltrating bioretention]]</li>  | ||
| − | </ul>  | + | </ul>}}  | 
| − | Where infiltration is impossible, LID design alternatives exist which can still capture and retain  stormwater:  | + | ----  | 
| + | {{TextBox|1= Where infiltration is impossible, LID design alternatives exist which can still capture and retain  stormwater:  | ||
<ul>  | <ul>  | ||
<li>[[Bioretention: Non-infiltrating | Bioretention planters]]</li>  | <li>[[Bioretention: Non-infiltrating | Bioretention planters]]</li>  | ||
<li>[[Rainwater harvesting]]</li>  | <li>[[Rainwater harvesting]]</li>  | ||
<li>[[Green roofs]]</li>  | <li>[[Green roofs]]</li>  | ||
| − | </ul>  | + | </ul>}}  | 
| − | |||
===Planning===  | ===Planning===  | ||
<h4>Soil infiltration rate</h4>  | <h4>Soil infiltration rate</h4>  | ||
Revision as of 08:22, 3 August 2017
Infiltration of stormwater into underlying soils is one the priority level 1. mechanisms to achieve MOECC Runoff Volume Control targets.
Infiltration is promoted through a number of LID BMPs:
- Infiltration chambers (underground)
 - Infiltration trenches (underground)
 - Dry ponds (surface)
 - Bioretention cells (surface)
 - Bioswales (surface)
 
Constraints[edit]
Infiltration practices are not recommended:
- Where the bedrock is within 1 m below the bottom of the proposed BMP,
 - Where the seasonal high groundwater level comes within 1 m below the bottom of the proposed BMP,
Or in areas where increased infiltration will result in elevated groundwater levels, which can be demonstrated to damage critical utilities or private property, - Over swelling clays or unstable sub-soils,
 - Over contaminated soils or sites with high risk of contamination from onsite activities,
 - In flood prone areas where the wastewater system is sensitive to groundwater conditions causing sewer backups, and where LID BMPs have been found to be ineffective,
 - In areas where the ecology and natural hydrology are dependent upon surface water,
 - Where prohibitions and/or restrictions exist per approved Source Protection Plans (see MOECC guidance).
 
Designing within constraints[edit]
Infiltration can still be optimized over 'tight' soils with infiltration rates ≤ 15 mm/hr:
Where infiltration is impossible, LID design alternatives exist which can still capture and retain stormwater:
Planning[edit]
Soil infiltration rate
Infiltration tests must be undertaken at the location, depth and with a head of water that replicates the proposed design.
| Catchment area | Consequence of failure | ||
|---|---|---|---|
| No damage or inconvenience | Minor damage or inconvenience to external structures (e.g. ponding in parking lot) | Significant damage to buildings or infrastructure (e.g. flooding damage) | |
| <100 m2 | 1.5 | 2 | 10 | 
| 100 - 1000 m2 | 1.5 | 3 | 10 | 
Groundwater
The bottom of the infiltration BMP must ≥ 1 m vertically separated from the seasonally high water table, and underlying bedrock. This reduces the risk of contaminating groundwater and helps to ensure reliable infiltration rates throughout the year.