Difference between revisions of "Infiltration"
Jenny Hill (talk | contribs)  | 
				Jenny Hill (talk | contribs)   | 
				||
| Line 36: | Line 36: | ||
===Planning===  | ===Planning===  | ||
<h4>Soil infiltration rate</h4>  | <h4>Soil infiltration rate</h4>  | ||
| − | + | [[Infiltration: Testing|Infiltration tests]] must be undertaken at the location, depth and with a head of water that replicates the proposed design.    | |
| − | + | <table class="table-responsive table table-striped">  | |
| − | |||
         <caption><strong>Suggested safety factors to be applied to measured percolation rate when designing infiltration facilities</strong></caption>  |          <caption><strong>Suggested safety factors to be applied to measured percolation rate when designing infiltration facilities</strong></caption>  | ||
         <tr class="success">  |          <tr class="success">  | ||
| Line 60: | Line 59: | ||
                     <td  class="text-center">10</td>  |                      <td  class="text-center">10</td>  | ||
             </tr>  |              </tr>  | ||
| − | + | </table>  | |
<h4>Groundwater</h4>  | <h4>Groundwater</h4>  | ||
| − | <p> The bottom of the infiltration BMP must ≥ 1 m vertically separated from the seasonally high water table, and underlying bedrock. This reduces the risk of contaminating groundwater and helps to ensure reliable infiltration rates throughout the year. </p>  | + | <p>The bottom of the infiltration BMP must ≥ 1 m vertically separated from the seasonally high water table, and underlying bedrock. This reduces the risk of contaminating groundwater and helps to ensure reliable infiltration rates throughout the year. </p>  | 
{{:Feedback}}  | {{:Feedback}}  | ||
[[category:Infiltration]]  | [[category:Infiltration]]  | ||
Revision as of 08:49, 3 August 2017
Infiltration of stormwater into underlying soils is one the priority level 1. mechanisms to achieve MOECC Runoff Volume Control targets.
Infiltration is promoted through a number of LID BMPs:
- Infiltration chambers (underground)
 - Infiltration trenches (underground)
 - Dry ponds (surface)
 - Bioretention cells (surface)
 - Bioswales (surface)
 
Constraints[edit]
Infiltration practices are not recommended:
- Where the bedrock is within 1 m below the bottom of the proposed BMP,
 - Where the seasonal high groundwater level comes within 1 m below the bottom of the proposed BMP,
Or in areas where increased infiltration will result in elevated groundwater levels, which can be demonstrated to damage critical utilities or private property, - Over swelling clays or unstable sub-soils,
 - Over contaminated soils or sites with high risk of contamination from onsite activities,
 - In flood prone areas where the wastewater system is sensitive to groundwater conditions causing sewer backups, and where LID BMPs have been found to be ineffective,
 - In areas where the ecology and natural hydrology are dependent upon surface water,
 - Where prohibitions and/or restrictions exist per approved Source Protection Plans (see MOECC guidance).
 
Designing within constraints[edit]
Infiltration can still be optimized over 'tight' soils with infiltration rates ≤ 15 mm/hr:
Where infiltration is impossible, LID design alternatives exist which can still capture and retain stormwater:
Planning[edit]
Soil infiltration rate
Infiltration tests must be undertaken at the location, depth and with a head of water that replicates the proposed design.
| Catchment area | Consequence of failure | ||
|---|---|---|---|
| No damage or inconvenience | Minor damage or inconvenience to external structures (e.g. ponding in parking lot) | Significant damage to buildings or infrastructure (e.g. flooding damage) | |
| <100 m2 | 1.5 | 2 | 10 | 
| 100 - 1000 m2 | 1.5 | 3 | 10 | 
Groundwater
The bottom of the infiltration BMP must ≥ 1 m vertically separated from the seasonally high water table, and underlying bedrock. This reduces the risk of contaminating groundwater and helps to ensure reliable infiltration rates throughout the year.
- REDIRECT Special:ArticleFeedbackv5