Difference between revisions of "Curb cuts"
| Jenny Hill (talk | contribs) | Jenny Hill (talk | contribs)  | ||
| Line 1: | Line 1: | ||
| − | |||
| − | |||
| ==Sizing== | ==Sizing== | ||
| To completely capture linear flow travelling along a gutter perpendicular to a curb inlet, the inlet must be of width:: | To completely capture linear flow travelling along a gutter perpendicular to a curb inlet, the inlet must be of width:: | ||
| <math>W_T=0.817Q^{0.42}S_{0}^{0.3}\left (\frac{1}{nS_{x}}\right)^{0.6}</math> | <math>W_T=0.817Q^{0.42}S_{0}^{0.3}\left (\frac{1}{nS_{x}}\right)^{0.6}</math> | ||
| − | Where the intention is to capture only a proportion of the flow, the ratio of flow entering the  | + | Where the intention is to capture only a proportion of the flow, the ratio of flow entering the curb inlet may be calculated:: | 
| <math>R_c=1-\left ( 1-\frac{W}{W_T} \right )^{1.8}</math> | <math>R_c=1-\left ( 1-\frac{W}{W_T} \right )^{1.8}</math> | ||
| ==Example== | ==Example== | ||
| + | A curb cut of 0.25 m is proposed as an inlet for an offline bioretention cell receiving runoff from an adjacent roadway. The x-slope is 3% and the longitudinal slope of the road is 2%. The design storm produces flow of 0.08 m<sup>3</sup>/s.  | ||
| + | |||
Revision as of 21:00, 28 September 2017
Sizing[edit]
To completely capture linear flow travelling along a gutter perpendicular to a curb inlet, the inlet must be of width::
Where the intention is to capture only a proportion of the flow, the ratio of flow entering the curb inlet may be calculated::
Example[edit]
A curb cut of 0.25 m is proposed as an inlet for an offline bioretention cell receiving runoff from an adjacent roadway. The x-slope is 3% and the longitudinal slope of the road is 2%. The design storm produces flow of 0.08 m3/s.
 
Curb cuts Gallery[edit]
- Curb cut into a bioretention facility in Hinsdale, IL. 
 Decorative aggregate in the center of the facility reduces erosion and dissipates power inflow around the inlet area. A monitoring/maintenance well can be seen in the foreground.
 Photo credit: CNT
- Curb cut into a bioretention facility in Brown Deer, WI. 
 Aggregate is used to reduce erosion around the inlet area.
 Photo credit: Aaron Volkening