| Line 67: | Line 67: | 
|  | The LID option that best fits your site will depend what types |  | The LID option that best fits your site will depend what types | 
|  | of source areas are present. Types of source areas include: |  | of source areas are present. Types of source areas include: | 
| − | • Active use area
 | + | * Active use area | 
| − | • Passive use area
 | + | * Passive use area | 
| − | • Pedestrian walkway
 | + | * Pedestrian walkway | 
| − | • Internal driveway
 | + | * Internal driveway | 
| − | • Parking lot
 | + | * Parking lot | 
|  | On park sites, pollution prevention is often associated with |  | On park sites, pollution prevention is often associated with | 
|  | changes to operations and maintenance practices and has |  | changes to operations and maintenance practices and has | 
| Line 133: | Line 133: | 
|  | and staff than small-scale projects. Large-scale LID projects |  | and staff than small-scale projects. Large-scale LID projects | 
|  | include: |  | include: | 
| − | *Bioretention | + | * Bioretention | 
|  | * Enhanced grass swales |  | * Enhanced grass swales | 
|  | * Bioswales |  | * Bioswales | 
| Line 151: | Line 151: | 
|  | quality and quantity objectives. Consider using an infiltration |  | quality and quantity objectives. Consider using an infiltration | 
|  | chamber or bioswale project to meet those objectives. |  | chamber or bioswale project to meet those objectives. | 
|  | + |   | 
|  | Before starting a large-scale retrofit project, consider the |  | Before starting a large-scale retrofit project, consider the | 
| − | following distinctions that set these retrofits apart from smallscale | + | following distinctions that set these retrofits apart from small-scale projects.<br> | 
| − | projects.<br> |  | 
|  | '''<h4>Integration with capital works programs</h4>''' |  | '''<h4>Integration with capital works programs</h4>''' | 
|  | Most large-scale LID retrofits must function with existing |  | Most large-scale LID retrofits must function with existing |