| Line 9: | Line 9: | 
|  | *Areas with mandatory [[Downspout Disconnection|downspout disconnection]] programs}} |  | *Areas with mandatory [[Downspout Disconnection|downspout disconnection]] programs}} | 
|  | <strong>The fundamental components of a rain barrel system are:</strong> |  | <strong>The fundamental components of a rain barrel system are:</strong> | 
| − | *A [[catchment]] where the rain lands, this will usually be a rooftop, | + | *A catchment where the rain lands, this will usually be a rooftop, | 
|  | *guttering and downspouts to channel the rainwater,   |  | *guttering and downspouts to channel the rainwater,   | 
|  | *screens or filters to remove leaves and other large debris,   |  | *screens or filters to remove leaves and other large debris,   | 
| Line 15: | Line 15: | 
|  | <strong>Additional components may include:</strong> |  | <strong>Additional components may include:</strong> | 
|  | *a tap or faucet fitted to the barrel, |  | *a tap or faucet fitted to the barrel, | 
| − | *a hosepipe or other irrigation system.   | + | *a hosepipe or other irrigation system. | 
|  |  |  |  | 
|  | ==Planning Considerations== |  | ==Planning Considerations== |