| Line 271: | Line 271: | 
|  | or bioswale. |  | or bioswale. | 
|  | Before starting a large-scale retrofit project, consider the |  | Before starting a large-scale retrofit project, consider the | 
| − | following distinctions that set these retrofits apart from smallscale | + | following distinctions that set these retrofits apart from small-scale | 
|  | projects. |  | projects. | 
| − | ===Integration with long-term infrastructure | + | ===Integration with long-term infrastructure replacement and rehabilitation plans=== | 
| − | replacement and rehabilitation plans=== |  | 
|  | Most large-scale LID retrofits must function with existing |  | Most large-scale LID retrofits must function with existing | 
|  | site infrastructure, such as storm sewers, catch basins, |  | site infrastructure, such as storm sewers, catch basins, | 
| Line 293: | Line 292: | 
|  | have been set aside for a parking lot replacement could be |  | have been set aside for a parking lot replacement could be | 
|  | transferred to a retrofit project. |  | transferred to a retrofit project. | 
|  | + |  | 
|  | ===Involvement of consultants and contractors=== |  | ===Involvement of consultants and contractors=== | 
|  | Consultants are required for large-scale retrofit projects, |  | Consultants are required for large-scale retrofit projects, |