Difference between revisions of "Pipes"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		 
		
	
Jenny Hill (talk | contribs) m  | 
				Jenny Hill (talk | contribs)  m  | 
				||
| Line 9: | Line 9: | ||
**A perforated pipe with many rectangular slots has better drainage characteristics than a pipe with similar open area provided by fewer circular holes <ref>Hazenberg, G., and U. S. Panu (1991), Theoretical analysis of flow rate into perforated drain tubes, Water Resour. Res., 27(7), 1411–1418, doi:10.1029/91WR00779.</ref>.  | **A perforated pipe with many rectangular slots has better drainage characteristics than a pipe with similar open area provided by fewer circular holes <ref>Hazenberg, G., and U. S. Panu (1991), Theoretical analysis of flow rate into perforated drain tubes, Water Resour. Res., 27(7), 1411–1418, doi:10.1029/91WR00779.</ref>.  | ||
*Non-perforated pipes should be used for conveyance to and away from the facility, including overflow.  | *Non-perforated pipes should be used for conveyance to and away from the facility, including overflow.  | ||
| − | <gallery>  | + | <gallery mode="packed" widths=200px heights=200px>  | 
Perforated Pipe 550x550.jpg|Pipe with slotted perforations  | Perforated Pipe 550x550.jpg|Pipe with slotted perforations  | ||
Pipe with connector.jpg|Perforated pipes awaiting installation, note the 30 degree connector used to facilitate maintenance.    | Pipe with connector.jpg|Perforated pipes awaiting installation, note the 30 degree connector used to facilitate maintenance.    | ||
Revision as of 08:48, 14 March 2018
Perforated pipes are a common component of underdrains, infiltration trenches and exfiltration trenches.
Pipes should have been manufactured in conformity with the latest standards by the Canadian Standards Association (CSA) or ASTM International.
- Perforated pipes should be continuously perforated, smooth interior HDPE (or equivalent material) with a minimum inside diameter of 100 mm.
- Smooth interior facilitates inspection and maintenance activities; internal corrugations can cause cameras or hydrojetting apparatus to become snagged.
 
 - Where freezing is a concern, horizontal underdrain pipes should be over-sized to a minimum 200 mm diameter.
 - Perforations should be made on all sides of the pipe and provide a ≥ 1 m2 of open area per linear meter of pipe.
- A perforated pipe with many rectangular slots has better drainage characteristics than a pipe with similar open area provided by fewer circular holes [1].
 
 - Non-perforated pipes should be used for conveyance to and away from the facility, including overflow.
 
See also: flow through perforated pipe
- ↑ Hazenberg, G., and U. S. Panu (1991), Theoretical analysis of flow rate into perforated drain tubes, Water Resour. Res., 27(7), 1411–1418, doi:10.1029/91WR00779.