| Line 81: | Line 81: | 
|  | |Pre-treatment   |  | |Pre-treatment   | 
|  | |style="text-align: left| |  | |style="text-align: left| | 
| − | #Minimum depth: 1 m;
 | + | *Minimum depth: 1 m; | 
| − | #Sized to ensure non-erosive velocities leaving forebay;
 | + | *Sized to ensure non-erosive velocities leaving forebay;   | 
| − | #Maximum area: 20 % of total permanent pool
 | + | *Maximum area: 20 % of total permanent pool | 
|  | |- |  | |- | 
|  | |Length-to-Width Ratio |  | |Length-to-Width Ratio | 
|  | |Maximize flow path and minimize short-circuiting potential |  | |Maximize flow path and minimize short-circuiting potential | 
|  | |style="text-align: left| |  | |style="text-align: left| | 
| − | #Overall: minimum 3:1;
 | + | *Overall: minimum 3:1;    | 
| − | #Forebay: minimum 2:1
 | + | *Forebay: minimum 2:1 | 
|  | |- |  | |- | 
|  | |Permanent pool depth |  | |Permanent pool depth | 
| Line 102: | Line 102: | 
|  | |Safety   |  | |Safety   | 
|  | |style="text-align: left| |  | |style="text-align: left| | 
| − | #5:1 For 3 m above and below permanent pool;
 | + | *5:1 For 3 m above and below permanent pool;   | 
| − | #Maximum 3:1 elsewhere
 | + | *Maximum 3:1 elsewhere | 
|  | |-   |  | |-   | 
|  | |Inlet   |  | |Inlet   | 
|  | |Avoid clogging/freezing   |  | |Avoid clogging/freezing   | 
|  | |style="text-align: left| |  | |style="text-align: left| | 
| − | #Minimum 450 mm;
 | + | *Minimum 450 mm;   | 
| − | #Preferred pipe slope: >1%;
 | + | *Preferred pipe slope: > 1 %;   | 
| − | #If submerged, obvert 150 mm below expected maximum ice depth
 | + | *If submerged, obvert 150 mm below expected maximum ice depth | 
|  | |- |  | |- | 
|  | |Outlet (See also [[flow control]]) |  | |Outlet (See also [[flow control]]) | 
|  | |Avoid clogging/freezing   |  | |Avoid clogging/freezing   | 
|  | |style="text-align: left| |  | |style="text-align: left| | 
| − | #Minimum:450mm outlet pipe;
 | + | *Minimum: 450 mm outlet pipe;   | 
| − | #Preferred pipe slope: >1%;
 | + | *Preferred pipe slope: > 1 %;   | 
| − | #If orifice control used,75mm diameter minimum;
 | + | *If orifice control used, 75 mm diameter minimum;   | 
| − | #Minimum 100mm orifice preferable
 | + | 8Minimum 100 mm orifice preferable   | 
|  | |- |  | |- | 
|  | |Maintenance access   |  | |Maintenance access   | 
|  | |Access for backhoes or dredging equipment |  | |Access for backhoes or dredging equipment | 
|  | |style="text-align: left| |  | |style="text-align: left| | 
| − | #Provided to approval of Municipality;
 | + | *Provided to approval of Municipality;   | 
| − | #Provision of maintenance drawdown pipe preferred
 | + | *Provision of maintenance drawdown pipe preferred | 
|  | |- |  | |- | 
|  | |Buffer   |  | |Buffer   |