| Line 81: |
Line 81: |
| | |Pre-treatment | | |Pre-treatment |
| | |style="text-align: left| | | |style="text-align: left| |
| − | #Minimum depth: 1 m;
| + | *Minimum depth: 1 m; |
| − | #Sized to ensure non-erosive velocities leaving forebay;
| + | *Sized to ensure non-erosive velocities leaving forebay; |
| − | #Maximum area: 20 % of total permanent pool
| + | *Maximum area: 20 % of total permanent pool |
| | |- | | |- |
| | |Length-to-Width Ratio | | |Length-to-Width Ratio |
| | |Maximize flow path and minimize short-circuiting potential | | |Maximize flow path and minimize short-circuiting potential |
| | |style="text-align: left| | | |style="text-align: left| |
| − | #Overall: minimum 3:1;
| + | *Overall: minimum 3:1; |
| − | #Forebay: minimum 2:1
| + | *Forebay: minimum 2:1 |
| | |- | | |- |
| | |Permanent pool depth | | |Permanent pool depth |
| Line 102: |
Line 102: |
| | |Safety | | |Safety |
| | |style="text-align: left| | | |style="text-align: left| |
| − | #5:1 For 3 m above and below permanent pool;
| + | *5:1 For 3 m above and below permanent pool; |
| − | #Maximum 3:1 elsewhere
| + | *Maximum 3:1 elsewhere |
| | |- | | |- |
| | |Inlet | | |Inlet |
| | |Avoid clogging/freezing | | |Avoid clogging/freezing |
| | |style="text-align: left| | | |style="text-align: left| |
| − | #Minimum 450 mm;
| + | *Minimum 450 mm; |
| − | #Preferred pipe slope: >1%;
| + | *Preferred pipe slope: > 1 %; |
| − | #If submerged, obvert 150 mm below expected maximum ice depth
| + | *If submerged, obvert 150 mm below expected maximum ice depth |
| | |- | | |- |
| | |Outlet (See also [[flow control]]) | | |Outlet (See also [[flow control]]) |
| | |Avoid clogging/freezing | | |Avoid clogging/freezing |
| | |style="text-align: left| | | |style="text-align: left| |
| − | #Minimum: 450mm outlet pipe;
| + | *Minimum: 450 mm outlet pipe; |
| − | #Preferred pipe slope: >1%;
| + | *Preferred pipe slope: > 1 %; |
| − | #If orifice control used, 75mm diameter minimum;
| + | *If orifice control used, 75 mm diameter minimum; |
| − | #Minimum 100mm orifice preferable
| + | 8Minimum 100 mm orifice preferable |
| | |- | | |- |
| | |Maintenance access | | |Maintenance access |
| | |Access for backhoes or dredging equipment | | |Access for backhoes or dredging equipment |
| | |style="text-align: left| | | |style="text-align: left| |
| − | #Provided to approval of Municipality;
| + | *Provided to approval of Municipality; |
| − | #Provision of maintenance drawdown pipe preferred
| + | *Provision of maintenance drawdown pipe preferred |
| | |- | | |- |
| | |Buffer | | |Buffer |