==Overview==
 
==Overview==
 
+
Free-water surface flow wetlands are most commonly employed for stormwater treatment and are similar to [[SWM ponds]] in function and design The most significant difference is the extent to which they are designed to incorporate shallow zones for wetland [[plants]]. A facility is normally characterized as a wetland if shallow zones (<0.5 m deep) make up more than 70 % of its volume.
 
   
{{textbox|Wetlands are an ideal technology for:  
 
{{textbox|Wetlands are an ideal technology for:  
*Text A
+
*Enhancing biodiversity
*Text B
+
*Providing a more aesthetic aquatic landscape
 
}}
 
}}
    +
Sub surface flow systems provide generally lower health and safety risks and are sometimes employed to handle stormwater in combination with another wastewater stream.
 +
 +
==Planning considerations==
 
{|class="wikitable"
 
{|class="wikitable"
|+ Types of Constructed Wetland
+
|+ Types of Constructed Wetland<ref>Grant, N., M. Moodie, and C. Weedon. 2000. Sewage Treatment Solutions. p. 35–67. In Sewage Solutions: Answering the Call of Nature. Centre for Alternative Technology Publications.</ref><ref name="EPA">United States Environmental Protection Agency. 1995. A HANDBOOK OF CONSTRUCTED WETLANDS: A guide to creating wetlands for agricultural wastewater, domestic wastewater, coal mine drainage and stormwater.</ref><ref>Jacques Whitford Consultants, 2008. CONSTRUCTED & ENGINEERED WETLANDS p. 1-21</ref>
 
|-  
 
|-  
!Type A
+
!Free-water surface flow
!Type B
+
!Horizontal sub-surface flow
!Type C
+
!Vertical sub-surface flow
 
|-
 
|-
|Surface water||Minimal<br>Any surface flow can be slowed with check dams||Ponding is encouraged with check dams
+
|[[File:Schematic of the Free Water Surface Constructed Wetland.jpg|frameless|upright=1.5]]
 +
|[[File:Tilley et al 2014 Schematic of the Horizontal Subsurface Flow Constructed Wetland.jpg|frameless|upright=1.5]]
 +
|[[File:Tilley et al 2014 Schematic of the Vertical Flow Constructed Wetland.jpg|frameless|upright=1.5]]
 
|-
 
|-
|Soil||Filter media required||Amendment preferable when possible
+
|style="text-align:left;"|'''Pros'''
 +
*Robust
 +
*Provides excellent water quality treatment
 +
*Resistant to temporary hydraulic overload
 +
*Can be beautiful
 +
*Sludge removal infrequent
 +
|style="text-align:left;"|'''Pros'''
 +
*Well established technology
 +
*May be natural looking, although often rectilinear in plan
 +
*Need little to no gradient
 +
*Provides buffer to discharge
 +
*Good pathogen removal from die off and predation
 +
*Minimal maintenance
 +
*Wide range of [[Wetland: list|plants]] suitable
 +
*Robust
 +
|style="text-align:left;"|'''Pros'''
 +
*High levels of treatment possible
 +
*May be run without power if significant gradient is available
 +
*Can be attractively designed to generate interest in the technology, may be any shape.
 +
*Maintenance is technically simple. Sludge easily removed
 +
*Biologically complex and robust
 +
*Failure tends to be gradual
 +
*Will function prior to establishment of vegetation
 
|-
 
|-
|Underdrain||Common||Uncommon
+
|style="text-align:left;"|'''Cons'''
|-
+
*Requires larger land area
|Maintenance||Medium to high||Low
+
*Sludge removal may be more difficult
|-
+
*Open water may generate more health and safety concerns.
|Stormwater benefit||High||Moderate
+
|style="text-align:left;"|'''Cons'''
|-
+
*Requires more land
|Biodiversity benefit||Increased with native planting||Typically lower
+
*Multiple substrate layers will promote stratification and channelization
 +
|style="text-align:left;"|'''Cons'''
 +
*Requires fall of at least 1.5 m to provide sufficient treatment
 +
*May be high cost
 +
*Sensitive to hydraulic overloading
 
|}
 
|}
   −
==Planning considerations==
   
==Design==
 
==Design==
 +
 +
===Sizing free-water===
 
{| class="wikitable"
 
{| class="wikitable"
 +
|+Design parameters for free-water surface flow wetlands <ref name="TRCA">Toronto and Region Conservation Authority (TRCA), and CH2M Hill Canada. 2018. Inspection and Maintenance Guide for Stormwater Management Ponds and Constructed Wetlands (T van Seters, L Rocha, and K Delidjakovva, Eds.).</ref>
 
!Element  
 
!Element  
 
!Design Objective  
 
!Design Objective  
Line 37: Line 69:  
|-
 
|-
 
|Drainage Area  
 
|Drainage Area  
|Sustaining vegetation, volumetric turnover
+
|Sustaining [[Plants|vegetation]], volumetric turnover
 
|style="text-align: left|5 Ha (≥10 Ha preferred)
 
|style="text-align: left|5 Ha (≥10 Ha preferred)
 
|-
 
|-
 
|Treatment Volume  
 
|Treatment Volume  
|Provision of appropriate level of protection (Table 3.2)
+
|Provision of appropriate level of protection  
|style="text-align: left|See Table 3.2
+
|style="text-align: left|See [[#.|below]]
 
|-
 
|-
 
|Active Storage
 
|Active Storage
 
|Detention
 
|Detention
|style="text-align: left|Suspended solids settling 24 hrs (12 hrs if in conflict with min. orifice size)
+
|style="text-align: left|[[Total Suspended solids|Suspended solids]] settling 24 hrs (12 hrs if in conflict with min. orifice size)
 
|-
 
|-
 
|Forebay  
 
|Forebay  
 
|Pre-treatment  
 
|Pre-treatment  
 
|style="text-align: left|
 
|style="text-align: left|
#Minimum depth: 1 m;
+
*Minimum depth: 1 m;
#Sized to ensure non-erosive velocities leaving forebay;  
+
*Sized to ensure non-erosive velocities leaving forebay;  
#Maximum area: 20 % of total permanent pool
+
*Maximum area: 20 % of total permanent pool
 
|-
 
|-
 
|Length-to-Width Ratio
 
|Length-to-Width Ratio
 
|Maximize flow path and minimize short-circuiting potential
 
|Maximize flow path and minimize short-circuiting potential
|
+
|style="text-align: left|
#Overall: minimum 3:1;   
+
*Overall: minimum 3:1;   
#Forebay: minimum 2:1
+
*Forebay: minimum 2:1
 
|-
 
|-
|Permanent Pool Depth
+
|Permanent pool depth
 
|Vegetation requirements, rapid settling
 
|Vegetation requirements, rapid settling
 
|style="text-align: left|The average permanent pool depth should range from 150 mm to 300 mm
 
|style="text-align: left|The average permanent pool depth should range from 150 mm to 300 mm
 
|-
 
|-
|Active Storage Depth
+
|Active storage depth
 
|Storage/flow control, sustaining vegetation
 
|Storage/flow control, sustaining vegetation
|style="text-align: left|Maximum 1.0m for storms < 10 year event
+
|style="text-align: left|Maximum 1.0 m for storms < 10 year event
 
|-
 
|-
|Side Slopes
+
|Side slopes (See also [[berms]])
 
|Safety  
 
|Safety  
 
|style="text-align: left|
 
|style="text-align: left|
#5:1 For 3 m above and below permanent pool;  
+
*5:1 For 3 m above and below permanent pool;  
#Maximum 3:1 elsewhere
+
*Maximum 3:1 elsewhere
 
|-  
 
|-  
 
|Inlet  
 
|Inlet  
 
|Avoid clogging/freezing  
 
|Avoid clogging/freezing  
 
|style="text-align: left|
 
|style="text-align: left|
#Minimum 450 mm;  
+
*Minimum 450 mm;  
#Preferred pipe slope: >1%;  
+
*Preferred pipe slope: > 1 %;  
#If submerged, obvert 150 mm below expected maximum ice depth
+
*If submerged, obvert 150 mm below expected maximum ice depth
 
|-
 
|-
|Outlet  
+
|Outlet (See also [[flow control]])
 
|Avoid clogging/freezing  
 
|Avoid clogging/freezing  
 
|style="text-align: left|
 
|style="text-align: left|
#Minimum: 450mm outlet pipe;  
+
*Minimum: 450 mm outlet pipe;  
#Preferred pipe slope: >1%;  
+
*Preferred pipe slope: > 1 %;  
#If orifice control used, 75mm diameter minimum;  
+
*If orifice control used, 75 mm diameter minimum;  
#Minimum 100mm orifice preferable
+
*Minimum 100 mm orifice preferable  
 
|-
 
|-
|Maintenance Access
+
|Maintenance access
 
|Access for backhoes or dredging equipment
 
|Access for backhoes or dredging equipment
 
|style="text-align: left|
 
|style="text-align: left|
#Provided to approval of Municipality;  
+
*Provided to approval of Municipality;  
#Provision of maintenance drawdown pipe preferred
+
*Provision of maintenance drawdown pipe preferred
 
|-
 
|-
 
|Buffer  
 
|Buffer  
Line 100: Line 132:  
|style="text-align: left|Minimum 7.5 m above maximum water quality/erosion control water level
 
|style="text-align: left|Minimum 7.5 m above maximum water quality/erosion control water level
 
|}
 
|}
 +
 +
===.===
 +
{| class="wikitable"
 +
|+Water volume storage requirements based on catchment type and receiving waters<ref name ="TRCA"/>
 +
!rowspan=2|Performance level
 +
!colspan=4|Storage volume (m<sup>3</sup>/Ha) required according to catchment impervious cover
 +
|-
 +
!35%
 +
!55%
 +
!70%
 +
!85%
 +
|-
 +
|80 % TSS removal||80||105||120||140
 +
|-
 +
|70 % TSS removal||60||70||80||90
 +
|-
 +
|60 % TSS removal||60||60||60||60
 +
|}
 +
 +
===Modeling sub-surface===
 +
'''[http://www.unep.or.jp/Ietc/Publications/Water_Sanitation/SubWet2/index.asp SubWet 2.0]''' is a modeling tool for <u>sub-surface flow wetlands</u> (both 100% constructed and naturalized/adapted). It can be used to simulate removal of nitrogen (including nitrogen in ammonia, nitrate and organic matter), phosphorus and BOD<sub>5</sub> in mg/l and the corresponding removal efficiencies (in %). Although the model has been calibrated already with data from cold and warm climates, users can further calibrate and validate it using local data observations.
 +
 +
==Materials==
 +
===Planting===
 +
See [[Wetlands: Plants]]
    
==Performance==
 
==Performance==
 +
Relative to a wet pond, a constructed wetland may offer added pollutant removal benefits due to enhanced biological uptake and the filtration effects of the vegetation.
 +
Early stage wetlands readily sorb phosphorus onto substrates and sediments. Phosphorus removal in wetland systems is usually carried out by incorporating alum sedimentation ponds or [[sand filters]] as cells of the system, and/or by polishing wetland effluent in an iron-dosed mechanical filter.<ref>Jacques Whitford Consultants, 2008. CONSTRUCTED & ENGINEERED WETLANDS p. 1-21</ref>
 +
 +
Freezing temperatures in winter and early spring can reduce treatment if the wetland either freezes solid or a cover of ice prevents the water from entering the wetland. If under-ice water becomes confined, water velocities may increase, thereby reducing contact times<ref name="EPA" />. Runoff in excess of maximum design flows should be [[Overflow#routing|diverted]] around the wetland to avoid excessive flows through the wetland.
 +
 
STEP (under previous name SWAMP) conducted their own research into the performance of stormwater wetlands, the project page and report can be viewed [https://sustainabletechnologies.ca/home/urban-runoff-green-infrastructure/conventional-stormwater-management/constructed-wetlands/performance-assessment-of-an-open-and-covered-stormwater-wetland-system-aurora-ontario/ here].
 
STEP (under previous name SWAMP) conducted their own research into the performance of stormwater wetlands, the project page and report can be viewed [https://sustainabletechnologies.ca/home/urban-runoff-green-infrastructure/conventional-stormwater-management/constructed-wetlands/performance-assessment-of-an-open-and-covered-stormwater-wetland-system-aurora-ontario/ here].
 +
 +
Central Lake Ontario Conservation Authority have been undertaking a coastal wetland monitoring project across Durham region, see [https://www.cloca.com/lwc/monitoring_coastal.php here].
    
==Gallery==
 
==Gallery==
 
{{:Wetlands: Gallery}}
 
{{:Wetlands: Gallery}}
   −
==Construction==
   
==See also==
 
==See also==
 +
*[[SWM ponds]]
 +
*[[Dry ponds]]
 +
*[[Plants]]
 +
 
==External links==
 
==External links==
 +
*[https://www.ontario.ca/page/wetland-conservation-strategy Ontario's wetland conservation strategy]
 +
*[https://cawt.ca/ Centre for Advancement of Water and Wastewater Technologies at Fleming College]
 +
 +
===Articles for review===
 +
#Kennedy, G., and T. Mayer. 2002. Natural and Constructed Wetlands in Canada: An Overview. Water Qual. Res. J. Canada 37(2): 295–325. doi: 10.2166/wqrj.2002.020.
 +
#Bendoricchio, G., L. Dal Cin, and J. Persson. 2000. Guidelines for free water surface wetland design. EcoSys Bd 8: 51–91. http://www.pixelrauschen.de/wet/design.pdf (accessed 9 May 2018).
 +
----