| − | <p>Turf reinforcement mats (TRM) may be required in swales which are designed to convey higher velocity events.  Most TRM are made of synthetic fibres and intended as a permanent part of the construction (unlike a temporary [[Erosion control blankets| erosion control blanket]]).
 | + | Turf reinforcement mats (TRM) may be required in swales which are designed to convey higher velocity events.  Most TRM are made of synthetic fibres and intended as a permanent part of the construction (unlike a temporary [[Erosion control blankets| erosion control blanket]]).    | 
|  | Mats should be applied with soil fill technique: |  | Mats should be applied with soil fill technique: | 
| − | <ol>
 | + | #Grade the swale and smooth the top soil, removing any debris and large rocks, | 
| − | <li>Grade the swale and smooth the top soil, removing any debris and large rocks,</li>
 | + | #Seed with turf grass mixture, | 
| − | <li>Seed with turf grass mixture,</li>
 | + | #Dig 150 mm anchor trench at the top of the channel, | 
| − | <li>Dig 150 mm anchor trench at the top of the channel,</li> 
 | + | #Secure blanket into the trench with staples every 300 mm. Backfill and compact soil into the trench, | 
| − | <li>Secure blanket into the trench with staples every 300 mm. Backfill and compact soil into the trench,</li>
 | + | #Unroll mat in the direction of flow. Staple as recommended by manufacturer, | 
| − | <li>Unroll mat in the direction of flow. Staple as recommended by manufacturer,</li>
 | + | #Overlaps should be 150 mm and stapled. Upstream mat should always overlay the downstream mat, | 
| − | <li>Overlaps should be 150 mm and stapled. Upstream mat should always overlay the downstream mat,</li>
 | + | #Anchor the bottom end of the channel in a similar fashion to the top, | 
| − | <li>Anchor the bottom end of the channel in a similar fashion to the top,</li>
 | + | #Apply 15-20 mm of [[topsoil]] over the TRM, without the use of heavy machinery which can tear the mat and/or compact the soil, | 
| − | <li>Apply 15-20 mm of [[topsoil]] over the TRM, without the use of heavy machinery which can tear the mat and/or compact the soil,</li>
 | + | #An [[Erosion control blankets| erosion control blanket]]  may be applied to protect the surface through the first one or two years, | 
| − | <li>An [[Erosion control blankets| erosion control blanket]]  may be applied to protect the surface through the first one or two years,</li>
 | + | #Irrigate until turf grass is established. | 