Difference between revisions of "Absorbent landscapes"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| Jenny Hill (talk | contribs) | Jenny Hill (talk | contribs)  | ||
| Line 19: | Line 19: | ||
| ==See also== | ==See also== | ||
| − | [[Downspout disconnection]] | + | *[[Downspout disconnection]] | 
| − | [[vegetated filter strips]] | + | *[[vegetated filter strips]] | 
| [[category: infiltration]] | [[category: infiltration]] | ||
Revision as of 13:50, 12 September 2017
Get excited! This page is going to contain content prepared by Dean Young!
Soil amendment guidelines (from 2010 guide section 3 - placed here by Jen)
Soil amendment sizing criteria: impervious area / soil area = 1
- use 100 mm compost, till to 300 - 450 mm depth
impervious area / soil area = 2
- use 200 mm compost, till to 300 - 450 mm depth
impervious area / soil area = 3
- use 300 mm compost, till to 450 - 600 mm depth
Compost should consist of well-aged (at least one year) leaf compost. Amended soil should have an organic content of 8-15% by weight or 30-40% by volume. Source: Soils for Salmon, 2005
In the meantime, here's a few materials links that may prove useful