Difference between revisions of "Permeable pavement: Plan review"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| Jenny Hill (talk | contribs)  (Created page with "==Plan checklist== #Do the plans include an appropriate construction sequence that is specific to the construction of the permeable pavement? #To avoid soil disturbance and co...") | Jenny Hill (talk | contribs)  m | ||
| Line 1: | Line 1: | ||
| ==Plan checklist== | ==Plan checklist== | ||
| − | #Do the plans include an appropriate construction sequence that is specific to the construction of the permeable pavement? | + | #Do the plans include an appropriate construction sequence that is specific to the construction of the [[permeable pavement]]? | 
| #To avoid soil disturbance and compaction during construction, will the proposed infiltration area be clearly marked before any site work begins? | #To avoid soil disturbance and compaction during construction, will the proposed infiltration area be clearly marked before any site work begins? | ||
| #Do the plans include an appropriate cross-sectional detail for the permeable pavement? | #Do the plans include an appropriate cross-sectional detail for the permeable pavement? | ||
Revision as of 09:42, 15 December 2017
Plan checklist[edit]
- Do the plans include an appropriate construction sequence that is specific to the construction of the permeable pavement?
- To avoid soil disturbance and compaction during construction, will the proposed infiltration area be clearly marked before any site work begins?
- Do the plans include an appropriate cross-sectional detail for the permeable pavement?