Difference between revisions of "Bioretention: Sizing and modeling"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
Jenny Hill (talk | contribs)  | 
				Jenny Hill (talk | contribs)   | 
				||
| Line 18: | Line 18: | ||
<btnWarning>[[Media:Infiltration_Sizing.xlsx]] Download tool (xlsx)</btnWarning>  | <btnWarning>[[Media:Infiltration_Sizing.xlsx]] Download tool (xlsx)</btnWarning>  | ||
| + | |||
| + | {{Clickable button|[[Media:Infiltration_Sizing.xlsx|text]]}}  | ||
Revision as of 12:01, 10 July 2017
- Gather input data: 
- The applicable infiltration coefficient (q) is calculated by applying the safety factor to the measured infiltration rate.
 - Determine the drainage catchment area (AD), and outline the location of the bioretention facility. To begin with, budget for at least 10% of the contributing impervious area to be required for the BMP.
 - Unless the biomedia fill material has been tested and certified otherwise, a porosity value (Vr) of 0.4 may be assumed (i.e. void ratio 40%).
 - Bioretention facilities are usually between 0.5 m and 1.25 m deep, owing to construction considerations. Determine the maximum available depth (cc max) from the site constraints. The Infiltration page lists these.
 - Identify the duration (D) and intensity (i) of design storm(s).
 
 - Calculate the required area
 
<ThirdLeft> <panelWarning> Download .xlsx calculation tool </panelWarning> </ThirdLeft><TwoThirdRight></TwoThirdRight><clearFix></clearFix> <clearFix></clearFix>
<btnWarning>Media:Infiltration_Sizing.xlsx Download tool (xlsx)</btnWarning>