| Line 26: |
Line 26: |
| | || | | || |
| | |Mulch composition should be correct | | |Mulch composition should be correct |
| | + | |- |
| | + | !colspan =2|Elevations |
| | + | |- |
| | + | |style="width:30px"| |
| | + | |Depth of the gravel and invert of the underdrain |
| | + | |- |
| | + | || |
| | + | |Inverts for inflow and outflow points |
| | + | |- |
| | + | || |
| | + | |Filter media depth |
| | + | |- |
| | + | || |
| | + | |Ponding depth provided between the surface of the filter bed and the overflow structure |
| | + | |- |
| | + | || |
| | + | |Mulch depth |
| | + | |- |
| | + | !colspan =2|Landscaping and Stabilization |
| | + | |- |
| | + | |style="width:30px"| |
| | + | |Correct vegetation should be planted |
| | + | |- |
| | + | || |
| | + | |Pretreatment area should be stabilized |
| | + | |- |
| | + | || |
| | + | |Drainage area should be stabilized prior to directing water to the bioretention |
| | + | |- |
| | + | !colspan =2|The following items should be checked after the first rainfall event, and adjustments should be made as necessary: |
| | + | |- |
| | + | |style="width:30px"| |
| | + | |Outfall protection/energy dissipation at concentrated inflow should be stable |
| | + | |- |
| | + | || |
| | + | |Flow should not concentrate and should spread evenly over the filter bed |
| | + | |- |
| | + | || |
| | + | |Ponded water at the surface of the bioretenton facility must drain within 24 hours of the end of the storm event. <br> The biomedia should fully drain within a maximum period of 72 hours |
| | + | |- |
| | + | || |
| | + | |Excessive sediment accumulation should not be present |
| | |} | | |} |
| − |
| |
| − | <tr><th colspan =2>Elevations</th></tr>
| |
| − | <tr><td width = "5%"></td><td>Depth of the gravel and invert of the underdrain</td></tr>
| |
| − | <tr><td></td><td>Inverts for inflow and outflow points</td></tr>
| |
| − | <tr><td></td><td><strong>Filter depth?</strong> after biomedia is placed</td></tr>
| |
| − | <tr><td></td><td>Ponding depth provided between the surface of the filter bed and the overflow structure</td></tr>
| |
| − | <tr><td></td><td>Mulch depth</td></tr>
| |
| − | <tr><th colspan =2>Landscaping and Stabilization</th></tr>
| |
| − | <tr><td width = "5%"></td><td>Correct vegetation should be planted</td></tr>
| |
| − | <tr><td></td><td>Pretreatment area should be stabilized</td></tr>
| |
| − | <tr><td></td><td>Drainage area should be stabilized prior to directing water to the bioretention</td></tr>
| |
| − | <tr><th colspan =2>The following items should be checked after the first rainfall event, and adjustments should be made as necessary:</th></tr>
| |
| − | <tr><td width = "5%"></td><td>Outfall protection/energy dissipation at concentrated inflow should be stable</td></tr>
| |
| − | <tr><td></td><td>Flow should not concentrate and should spread evenly over the filter bed</td></tr>
| |
| − | <tr><td></td><td>Ponded water at the surface of the bioretenton facility must drain within 24 hours of the end of the storm event. <br> The biomedia should fully drain within a maximum period of 72 hours</td></tr>
| |
| − | <tr><td></td><td>Excessive sediment accumulation should not be present</td></tr>
| |
| − | </table>
| |
| | | | |
| | [[category:Checklists]] | | [[category:Checklists]] |
| | [[category:Construction]] | | [[category:Construction]] |