| Line 77: |
Line 77: |
| | | | |
| | ==Data Analysis/Modelling== | | ==Data Analysis/Modelling== |
| − | Suggest detailed modelling to evaluate how source and conveyance controls could provide a flood control function | + | *Suggest detailed modelling to evaluate how source and conveyance controls could provide a flood control function |
| − | Fieldwork | + | *Fieldwork |
| − | Visit sites to record information/interview designer/landowner | + | *Visit sites to record information/interview designer/landowner |
| − | Technical Input/Design Considerations | + | *Technical Input/Design Considerations |
| − | If flood control is your goal how does that impact other performance measures? | + | *If flood control is your goal how does that impact other performance measures? |
| − | How do other combinations of infrastructure impact effectiveness? For example, underdrains, ponding overflow drains, and inlets/outlets may significantly reduce the effectiveness of the practice to retain runoff and also increase costs? | + | *How do other combinations of infrastructure impact effectiveness? For example, underdrains, ponding overflow drains, and inlets/outlets may significantly reduce the effectiveness of the practice to retain runoff and also increase costs? |
| − | How would we have designed Elm Drive differently? | + | *How would we have designed Elm Drive differently? |
| − | Reducing the potential to mobilize and wash out soil media and erode the practice (this was a big concern raised by Mississauga with the LRT) | + | *Reducing the potential to mobilize and wash out soil media and erode the practice (this was a big concern raised by Mississauga with the LRT) |
| − | Inlet design to accept the minor and major system | + | *Inlet design to accept the minor and major system |
| − | How to incorporate emergency overflow structures into the design? | + | *How to incorporate emergency overflow structures into the design? |
| − | What features can be incorporated to all you to adjust the infrastructure? | + | *What features can be incorporated to all you to adjust the infrastructure? |
| − | Operation & Maintenance considerations | + | ===Operation & Maintenance considerations=== |
| − | Reporting
| |
| − | Literature Review Summary
| |
| − | TOC/Outline
| |
| − | First Draft
| |
| − | Second Draft
| |
| − | Final
| |
| − | Meeting with Executive Planning Committee (@TRCA)
| |
| − | 5 meetings
| |
| − | Webinar with CO
| |
| − | Planning Webinar
| |
| − | Attend Webinar
| |
| − | Internal CVC
| |
| − | Chapter coordination etc.
| |
| − | | |
| − | | |
| − | | |
| | | | |
| | Check for related content on [[Peak flow]] | | Check for related content on [[Peak flow]] |