Changes

Jump to navigation Jump to search
m
no edit summary
Line 16: Line 16:  
*The soil in the bottom of the excavation should be ripped to promote greater infiltration.
 
*The soil in the bottom of the excavation should be ripped to promote greater infiltration.
 
*Any accidental sediment accumulation from construction should be removed at this time.
 
*Any accidental sediment accumulation from construction should be removed at this time.
 +
 +
----

Navigation menu