| Line 56: | 
Line 56: | 
|   | * Infiltration volume target for the design storm event, V<sub>i</sub> (m<sup>3</sup>), based on average annual water budgets for the catchment for pre- and post-development scenarios and equal to the infiltration volume deficit (pre-development minus post-development annual infiltration)  |   | * Infiltration volume target for the design storm event, V<sub>i</sub> (m<sup>3</sup>), based on average annual water budgets for the catchment for pre- and post-development scenarios and equal to the infiltration volume deficit (pre-development minus post-development annual infiltration)  | 
|   | * Drainage time, t (h), time required to fully drain the active water storage components of the practice (i.e surface ponding and infiltration water storage depths), based on local criteria or long term average inter-event period for the location  |   | * Drainage time, t (h), time required to fully drain the active water storage components of the practice (i.e surface ponding and infiltration water storage depths), based on local criteria or long term average inter-event period for the location  | 
| − | * Field measured infiltration rate of the underlying native soil, f (mm/h), median of measurements or based on interpolation from median grain-size distribution results  | + | * Field measured infiltration rate of the underlying native soil, f (mm/h), median of field measurements or based on interpolation from median grain-size distribution results  | 
|   | * Design infiltration rate of the underlying native soil, f' (mm/h), median field measured value, f divided by a safety factor, z  |   | * Design infiltration rate of the underlying native soil, f' (mm/h), median field measured value, f divided by a safety factor, z  | 
|   | * Safety factor, z (dimensionless value between 2 and 3) chosen by designer based on consideration of risk factors  |   | * Safety factor, z (dimensionless value between 2 and 3) chosen by designer based on consideration of risk factors  |