| Line 50: | Line 50: | 
|  | !style="background: darkcyan; color: white"|Sump depth* |  | !style="background: darkcyan; color: white"|Sump depth* | 
|  | |- |  | |- | 
| − | |Infiltration trench||Two growing seasons||Silty clay||10:1||<10 cm; flow rate control||80% | + | |Infiltration trench<ref>Van Seters, T. and Young, D., 2015, Performance Comparison of Surface and Underground Stormwater Infiltration Practices, TRCA, Toronto, Ontario</ref>||Two growing seasons||Silty clay||10:1||<10 cm; flow rate control||80% | 
|  | |- |  | |- | 
| − | |Bioretention||Two growing seasons||Silty clay||10:1||<10 cm; flow rate control||90% | + | |Bioretention<ref>Van Seters, T. and Young, D., 2015, Performance Comparison of Surface and Underground Stormwater Infiltration Practices, TRCA, Toronto, Ontario</ref>||Two growing seasons||Silty clay||10:1||<10 cm; flow rate control||90% | 
|  | |- |  | |- | 
| − | |Permeable Pavement||Five growing seasons||Silty clay||1:1||<10 cm; flow rate control||45% | + | |Permeable Pavement<ref>Van Seters, T. and Drake, J. Five year evaluation of Permeable Pavements, TRCA, Toronto, Ontario</ref>||Five growing seasons||Silty clay||1:1||<10 cm; flow rate control||45% | 
|  | |- |  | |- | 
|  | |Bioretention||One growing season||Silty clay||10:1||<10 cm; flow rate control||83% |  | |Bioretention||One growing season||Silty clay||10:1||<10 cm; flow rate control||83% | 
| Line 78: | Line 78: | 
|  | |Permeable pavement||Four years||Silty clay fill over clay till||1:1||?||? |  | |Permeable pavement||Four years||Silty clay fill over clay till||1:1||?||? | 
|  | |} |  | |} | 
| − | |*Represents depth of sump below underdrain or outflow pipe.  In some cases, a flow control device was installed to slow outflow rates and enhance infiltration
 | + | <nowiki>*</nowiki>Represents depth of sump below underdrain or outflow pipe.  In some cases, a flow control device was installed to slow outflow rates and enhance infiltration | 
|  | 2.	Also known as the Etobicoke Exfiltration system |  | 2.	Also known as the Etobicoke Exfiltration system | 
|  |  |  |  | 
| − |   | + | ==References== | 
| − | References: | + | <references/> | 
| − |   |  | 
| − |   |  | 
| − | Young, D., Van Seters, T., Graham, C. 2013 Evaluation of Underground Stormwater Infiltration Systems, TRCA, Toronto, Ontario
 |  | 
| − | Van Seters, T. and Young, D., 2015, Performance Comparison of Surface and Underground Stormwater Infiltration Practices, TRCA, Toronto, Ontario
 |  | 
| − | Van Seters T and Graham C, 2014, Performance Evaluation of a Bioretention System, TRCA, Toronto, Ontario
 |  | 
| − | SNAP studies of residential rain gardens (need to find reference)
 |  | 
| − | Van Seters, T. and Drake, J. Five year evaluation of Permeable Pavements, TRCA, Toronto, Ontario
 |  | 
| − | STEP, Performance evaluation of Permeable Pavements – tech brief
 |  | 
| − | Calstone report – need to find reference
 |  | 
| − | Young D, Van Seters T, Graham, C, 2013, Evaluation of Residential Lot Level Stormwater Practices – tech brief
 |  | 
| − | SWAMP, 2005.  Performance Assessment of a Perforated Pipe Stormwater Exfiltration system, Toronto, Ontario, TRCA, Toronto, Ontario
 |  | 
| − | SWAMP, 2002, Performance Assessment of a Swale Perforated Pipe Stormwater Infiltration System, TRCA, Toronto Ontario
 |  | 
| − | + CVC stydies
 |  |