| Line 43: | Line 43: | 
|  |  |  |  | 
|  | ==Calculate the maximum overall depth== |  | ==Calculate the maximum overall depth== | 
| − | *Step 1. Determine what the planting needs are and assign appropriate depth of media. | + | *Step 1: Determine what the planting needs are and assign appropriate depth of media.   | 
| − | *Step 2. Decide on the underdrain pipe diameter. | + | *Step 2: Decide on the underdrain pipe diameter.   | 
| − | *Step 3. Determine maximum possible storage reservoir depth beneath the pipe (''d<sub>S</sub>''): | + | *Step 3: Determine maximum possible storage reservoir depth beneath the pipe (''d<sub>S</sub>''): | 
|  | <math>d_{S}=f'\times38.4</math> |  | <math>d_{S}=f'\times38.4</math> | 
|  | {{Plainlist|1=Where: |  | {{Plainlist|1=Where: | 
| Line 52: | Line 52: | 
|  |  |  |  | 
|  | ===Additional step for system without underdrain=== |  | ===Additional step for system without underdrain=== | 
| − | *Step 4. Determine maximum permissible ponding depth (''d<sub>P</sub>''): | + | *Step 4: Determine maximum permissible ponding depth (''d<sub>P</sub>''): | 
|  | <math>d_{P}=f'\times19.2</math> |  | <math>d_{P}=f'\times19.2</math> | 
|  | {{Plainlist|1=Where: |  | {{Plainlist|1=Where: | 
|  | *''f''' = Design infiltration rate in mm/hr, and |  | *''f''' = Design infiltration rate in mm/hr, and | 
|  | *19.2 comes from multiplying desired drainage time of 48 hours by void ratio of 0.4. Note that conceptually the drainage of the ponded area is limited by ex-filtration at the base of the practice.}} |  | *19.2 comes from multiplying desired drainage time of 48 hours by void ratio of 0.4. Note that conceptually the drainage of the ponded area is limited by ex-filtration at the base of the practice.}} | 
| − | * Step 5. Sum total depth of bioretention and compare to available space above water table and bedrock. Adjust if necesary. | + | * Step 5: Sum total depth of bioretention and compare to available space above water table and bedrock. Adjust if necesary.   | 
|  |  |  |  | 
|  | ==Calculate the remaining dimensions== |  | ==Calculate the remaining dimensions== | 
| − | * Step 6. Multiply the depth of each separate component by the void ratio and then sum the total. | + | * Step 6: Multiply the depth of each separate component by the void ratio and then sum the total. | 
|  | + | * Step 7: Calculate the required total storage (in m<sup>3</sup>): | 
|  |  |  |  | 
| − | ==Calculate the required total storage capacity==
 | + | <math>Storage=RVC_T\times Catchment area\times0.095</math> | 
| − |   |  | 
| − | <math>Storage=RVC_T\times Catchment area\times0.95</math> |  | 
|  | {{Plainlist|1=Where: |  | {{Plainlist|1=Where: | 
| − | *''f''' =Design infiltration rate in mm/hr, and | + | *''RVC<sub>T</sub>''' = Runoff volume control target (mm), and | 
| − | *19.2 comes from multiplying desired drainage time of 48 hours by void ratio of 0.4. Note that conceptually the drainage of the ponded area islimited by ex-filtration at thebase of thepractice.}} | + | * Area (Ha) | 
|  | + | * 0.095 is the product of a typical runoff coefficient for impermeable surfaces (0.95) and the units correction between m<sup>3</sup> and mm.Ha.}} | 
|  |  |  |  | 
|  |  |  |  |