| Line 8: | Line 8: | ||
| |- | |- | ||
| − | |Setback from building Foundation(m) | + | |colspan="2" |Setback from building Foundation(m)|| 4 ||  || 4 ||  ||  || Max. load of 10:1 for infiltration systems (not specific to LID type) ||  || | 
| |- | |- | ||
| − | | (Impervious drainage/treatment)area | | + | |colspan="2"|(Impervious drainage/treatment)area  ||5:1-20:1, 10:1 recommended ||  || 5:1-20:1, 10:1 recommended || CDA < 5 acres || CDA < 2 acres (T), < 5 acres (B) || < 2 acres ||  || CDA: max. 15000 ft2| | 
| |- | |- | ||
| − | |  Natural Slope (%)  | + | |colspan="2"|  Natural Slope (%) || < 15 ||  || < 15 ||  ||  ||  ||  ||   | 
| |- | |- | ||
| − | | A capped vertical sandpipe, perfored instaled to  | + | | colspan="2"|A capped vertical sandpipe, perfored instaled to the bottom of the facility to monitor drainage time  || 100-150 mm ||  || 100-150 mm ||  ||  ||  ||  ||   | 
| + | |||
| |- | |- | ||
| − | |  | + | | colspan="2"|Filter Mdia  | 
| |- | |- | ||
| − | |  | + | |   |     ||Stone Resvoir ||  ||  ||  || 1.5" to 3" stone dia., 2" pea gravel above 6" sand below || 1.5"-3.5" stone dia. For stone layer, 3" layer of washed river stone, or No. 8 or 89 stone above, 6-8 " of sand below || Stone 1.5"-3.5" ||  || Drain rock 3/4"-2.5 " washed open graded aggregate | 
| |- | |- | ||
| − | |  || Void space(%)  | + | |  || Void space(%) || 30-40 || 30-40 || 30-40 ||  ||  ||  ||  ||   | 
| |- | |- | ||
| − | |  || Granular material (clear stone)(mm)  | + | |  || Granular material (clear stone)(mm) || 50 || 50 || 50 ||  ||  ||  ||  ||   | 
| |- | |- | ||
| − | |  || Geotextile, around the stone  | + | |  || Geotextile, around the stone reservoirwith an overlap at the top  || min. 300 mm || 300 || min. 300 mm ||  ||  ||  ||  ||   | 
| + | |||
| |- | |- | ||
| − | |  | + | | colspan="2"| Bottom widh of excavations (mm) || 600-2400 || 600-2400 || 600-2400 ||  ||  ||  ||  ||   | 
| |- | |- | ||
| − | |  | + | | colspan="2"|Minimum depth of excavations under concrete laneway (mm) ||  ||  ||  ||  ||  ||  || 3000 | | 
| |- | |- | ||
| − | |  | + | | colspan="2"| length of time for draining after storm event (>25mm) ||  ||  ||  ||  ||  || max. 72 hr ||  || max.72 hr, 48 recommended |   | 
| |- | |- | ||
| − | |  | + | | colspan="2"| Depth to high water table (m) ||  ||  ||  ||  ||  || 1 ||  || 1 |   | 
| |- | |- | ||
| − | |  | + | |  colspan="2"|Sand layer depth (mm) ||  ||  ||  ||  ||  ||  || 150-300 || | 
| |- | |- | ||
| − | + | |  colspan="2"|Subdrains ||  ||  ||  || Inlet pipes (mm) ||  ||  || 100-200 || | |
| |- | |- | ||
| − | |  | + | | colspan="2"|Overflow ( if infiltration rate ) ||  ||  ||  ||  ||  ||  || < 15 mm/hr || | 
| |- | |- | ||
| − | + | |  colspan="2"|Facilties reciving road runoff are not located within time of travel  ||  ||  ||  ||  ||  || 2 ||  || 2 | | |
| |- | |- | ||
| − | |  | + | |  colspan="2"|wellhead protection areas, year ||  ||  ||  ||  ||  ||  || || | | 
| − | |||
| − | | wellhead protection areas, year ||  ||  ||  ||  ||  ||  | | ||
| |} | |} | ||
Revision as of 10:24, 26 September 2017
| LID Practice | CANADA | United States | |||||||
|---|---|---|---|---|---|---|---|---|---|
| Soakaways, Infiltration Trenches and Chambers | CVC+TRCA (Factsheets-2010)[1] | Toronto- 2016 | LID-SWM Guide 2010[2] | Massachusets SW BMP-2013 | District of Columbia-SWM Guidebook-2010 | W. Virginia-SWM design guidance manual-2012 | Pennsylvania-City of Philadelphia green St. design manual-2014 | Oregon SWM Manual-2014 | |
| Setback from building Foundation(m) | 4 | 4 | Max. load of 10:1 for infiltration systems (not specific to LID type) | ||||||
| (Impervious drainage/treatment)area | 5:1-20:1, 10:1 recommended | 5:1-20:1, 10:1 recommended | CDA < 5 acres | CDA < 2 acres (T), < 5 acres (B) | < 2 acres | ||||
| Natural Slope (%) | < 15 | < 15 | |||||||
| A capped vertical sandpipe, perfored instaled to the bottom of the facility to monitor drainage time | 100-150 mm | 100-150 mm | |||||||
| Filter Mdia | |||||||||
| Stone Resvoir | 1.5" to 3" stone dia., 2" pea gravel above 6" sand below | 1.5"-3.5" stone dia. For stone layer, 3" layer of washed river stone, or No. 8 or 89 stone above, 6-8 " of sand below | Stone 1.5"-3.5" | Drain rock 3/4"-2.5 " washed open graded aggregate | |||||
| Void space(%) | 30-40 | 30-40 | 30-40 | ||||||
| Granular material (clear stone)(mm) | 50 | 50 | 50 | ||||||
| Geotextile, around the stone reservoirwith an overlap at the top | min. 300 mm | 300 | min. 300 mm | ||||||
| Bottom widh of excavations (mm) | 600-2400 | 600-2400 | 600-2400 | ||||||
| Minimum depth of excavations under concrete laneway (mm) | |||||||||
| length of time for draining after storm event (>25mm) | max. 72 hr | ||||||||
| Depth to high water table (m) | 1 | ||||||||
| Sand layer depth (mm) | 150-300 | ||||||||
| Subdrains | Inlet pipes (mm) | 100-200 | |||||||
| Overflow ( if infiltration rate ) | < 15 mm/hr | ||||||||
| Facilties reciving road runoff are not located within time of travel | 2 | ||||||||
| wellhead protection areas, year | |||||||||