Talk:Soakaways, Infiltration Trenches and Infiltration Chambers Guide
Jump to navigation
Jump to search
This page is an archive, please do not review, use or cite the contents below
| LID Practice | CANADA | United States | |||||||
|---|---|---|---|---|---|---|---|---|---|
| Soakaways, Infiltration Trenches and Chambers | CVC+TRCA (Factsheets-2010)[1] | Toronto- 2016 | LID-SWM Guide 2010[2] | Massachusets SW BMP-2013 | District of Columbia-SWM Guidebook-2010 | W. Virginia-SWM design guidance manual-2012 | Pennsylvania-City of Philadelphia green St. design manual-2014 | Oregon SWM Manual-2014 | |
| Setback from Building Foundation (m) | 4 | 4 | |||||||
| (Impervious Drainage/Treatment) Area | 5:1-20:1, 10:1 recommended | 5:1-20:1, 10:1 recommended | CDA < 5 acres | CDA < 2 acres (T), < 5 acres (B) | < 2 acres | Max. load of 10:1 for infiltration systems (not specific to LID type) | |||
| Natural Slope (%) | < 15 | < 15 | |||||||
| A capped vertical standpipe, perforated installed to the bottom of the facility to monitor drainage time (mm) | 100-150 | 100-150 | |||||||
| Filter media | |||||||||
| Stone Resvoir | 1.5" to 3" stone dia., 2" pea gravel above 6" sand below | 1.5"-3.5" stone dia. For stone layer, 3" layer of washed river stone, or No. 8 or 89 stone above, 6-8 " of sand below | Stone 1.5"-3.5" | Drain rock 3/4"-2.5 " washed open graded aggregate | |||||
| Void Space(%) | 30-40 | 30-40 | 30-40 | ||||||
| Granular Material (clear stone)(mm) | 50 | 50 | 50 | ||||||
| Geotextile around the stone reservoir with an overlap at the top (mm) | min. 300 | 300 | min. 300 | ||||||
| Bottom Width of Excavations (mm) | 600-2400 | 600-2400 | 600-2400 | ||||||
| Minimum Depth of Excavations under concrete laneway (mm) | 3000 | ||||||||
| Length of Time for Draining after Storm Event (>25mm) | max. 72 hr. | max. 72 hr., 48 hr. recommended | |||||||
| Depth to High Water Table (m) | 1 | 1 | |||||||
| Sand Layer Depth (mm) | 150-300 | Length of Time for Draining after Storm Event (>25mm) | |||||||
| Subdrains Inlet Pipes (mm) | 100-200 | ||||||||
| Overflow is required when the infiltration rate equals | < 15 mm/hr | ||||||||
| Facilities receiving road runoff are not located within time of travel wellhead protection areas (years) | 2 | 2 | |||||||