| Line 12: | Line 12: | 
|  | |- |  | |- | 
|  | |colspan="2"|(Impervious drainage/treatment) area |  | |colspan="2"|(Impervious drainage/treatment) area | 
| − | |5:1-20:1, 10:1 recommended ||  || 5:1-20:1, 10:1 recommended ||CDA < 5 acres||CDA < 2 acres (T), < 5 acres (B)||< 2 acres || Max. load of 10:1 for infiltration systems (not specific to LID type)|| CDA: max. 15000 ft2| | + | |5:1-20:1, 10:1 recommended ||   || 5:1-20:1, 10:1 recommended ||CDA < 5 acres||CDA < 2 acres (T), < 5 acres (B)||< 2 acres || Max. load of 10:1 for infiltration systems (not specific to LID type)||CDA: max. 15000 ft2|| | 
|  | |- |  | |- | 
|  | |colspan="2"|  Natural Slope (%) || < 15 ||  || < 15 ||  ||  ||  ||  ||   |  | |colspan="2"|  Natural Slope (%) || < 15 ||  || < 15 ||  ||  ||  ||  ||   | 
| Line 36: | Line 36: | 
|  | | colspan="2"| Bottom widh of excavations (mm) || 600-2400 || 600-2400 || 600-2400 ||  ||  ||  ||  ||   |  | | colspan="2"| Bottom widh of excavations (mm) || 600-2400 || 600-2400 || 600-2400 ||  ||  ||  ||  ||   | 
|  | |- |  | |- | 
| − | | colspan="2"|Minimum depth of excavations under concrete laneway (mm) ||  ||  ||  ||  ||  ||  || 3000 | | + | | colspan="2"|Minimum depth of excavations under concrete laneway (mm) ||  ||  3000||  ||  ||  ||  || || | 
|  | |- |  | |- | 
| − | | colspan="2"| length of time for draining after storm event (>25mm) ||  ||  ||  ||  ||  || max. 72 hr ||  || max.72 hr, 48 recommended | | + | | colspan="2"| length of time for draining after storm event (>25mm) || max. 72 hr ||  || max.72 hr, 48 recommended ||  ||    ||    ||    || | 
|  | |- |  | |- | 
| − | | colspan="2"| Depth to high water table (m) ||  ||  || || || ||1 || ||1 | | + | | colspan="2"| Depth to high water table (m) || 1 ||  || 1 ||   ||    ||  ||   ||   |      | 
|  | |- |  | |- | 
| − | |  colspan="2"|Sand layer depth (mm) ||  ||  ||  ||  || ||  ||150-300 || | + | |  colspan="2"|Sand layer depth (mm) || |  ||150-300 ||  ||   ||  ||   ||  ||  | | 
|  | |- |  | |- | 
| − | |  colspan="2"|Subdrains ||  ||  ||  ||Inlet pipes (mm) ||  ||  ||100-200 || | + | |  colspan="2"|Subdrains Inlet pipes (mm) ||  || 100-200 ||  ||   ||   ||  ||  ||   | | 
|  | |- |  | |- | 
| − | | colspan="2"|Overflow ( if infiltration rate ) ||  ||  ||  ||  || ||  ||< 15 mm/hr || | + | | colspan="2"|Overflow ( if infiltration rate ) ||  || < 15 mm/hr ||  ||  ||   ||  ||   ||   |   | 
|  | |- |  | |- | 
| − | |  colspan="2"|Facilties reciving road runoff are not located within time of travel  ||  ||  ||  ||  ||  || 2 ||  || 2 | | + | |  colspan="2"|Facilties reciving road runoff are not located within time of travel wellhead protection areas, year || 2 ||  || 2 ||  ||  ||  ||  ||  | | 
| − | |-
 | + |   | 
| − | |  colspan="2"|wellhead protection areas, year || ||  || ||  ||  ||  || || |
 |  | 
|  | |} |  | |} |