Difference between revisions of "Talk:Soakaways, Infiltration Trenches and Infiltration Chambers Guide"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| Line 8: | Line 8: | ||
| |- | |- | ||
| − | |colspan="2" |Setback from building Foundation(m) | + | |colspan="2" |'''Setback from building Foundation(m)''' | 
| | 4 ||  || 4 ||  ||  ||  ||  || | | 4 ||  || 4 ||  ||  ||  ||  || | ||
| |- | |- | ||
| − | |colspan="2"|(Impervious drainage/treatment) area | + | |colspan="2"|'''(Impervious drainage/treatment) area''' | 
| |5:1-20:1, 10:1 recommended ||   || 5:1-20:1, 10:1 recommended ||CDA < 5 acres||CDA < 2 acres (T), < 5 acres (B)||< 2 acres || Max. load of 10:1 for infiltration systems (not specific to LID type)||CDA: max. 15000 ft2|| | |5:1-20:1, 10:1 recommended ||   || 5:1-20:1, 10:1 recommended ||CDA < 5 acres||CDA < 2 acres (T), < 5 acres (B)||< 2 acres || Max. load of 10:1 for infiltration systems (not specific to LID type)||CDA: max. 15000 ft2|| | ||
| |- | |- | ||
| − | |colspan="2"|  Natural Slope (%) || < 15 ||  || < 15 ||  ||  ||  ||  ||   | + | |colspan="2"|  '''Natural Slope (%)''' || < 15 ||  || < 15 ||  ||  ||  ||  ||   | 
| |- | |- | ||
| − | | colspan="2"|A capped vertical sandpipe, perfored instaled to the bottom of the facility to monitor drainage time  || 100-150 mm ||  || 100-150 mm ||  ||  ||  ||  ||   | + | | colspan="2"|'''A capped vertical sandpipe, perfored instaled to the bottom of the facility to monitor drainage time'''  || 100-150 mm ||  || 100-150 mm ||  ||  ||  ||  ||   | 
| |- | |- | ||
| − | | colspan="2"|Filter Mdia   | + | | colspan="2"|'''Filter Mdia'''  | 
| |- | |- | ||
| − | + | |colspan="2" style="text-align: right;|Stone Resvoir ||  ||  ||  || 1.5" to 3" stone dia., 2" pea gravel above 6" sand below || 1.5"-3.5" stone dia. For stone layer, 3" layer of washed river stone, or No. 8 or 89 stone above, 6-8 " of sand below || Stone 1.5"-3.5" ||  || Drain rock 3/4"-2.5 " washed open graded aggregate | |
| − | |||
| |- | |- | ||
| − | + | |colspan="2" style="text-align: right;| Void space(%) || 30-40 || 30-40 || 30-40 ||  ||  ||  ||  ||   | |
| − | |||
| |- | |- | ||
| − | + | |colspan="2" style="text-align: right;| Granular material (clear stone)(mm) || 50 || 50 || 50 ||  ||  ||  ||  ||   | |
| − | |||
| |- | |- | ||
| − | + | |colspan="2" style="text-align: right;|Geotextile around the stone reservoirwith an overlap at the top   || min. 300 mm || 300 || min. 300 mm ||  ||  ||  ||  ||   | |
| − | |||
| |- | |- | ||
| − | | colspan="2"| Bottom widh of excavations (mm) || 600-2400 || 600-2400 || 600-2400 ||  ||  ||  ||  ||   | + | | colspan="2"| '''Bottom widh of excavations (mm)''' || 600-2400 || 600-2400 || 600-2400 ||  ||  ||  ||  ||   | 
| |- | |- | ||
| − | | colspan="2"|Minimum depth of excavations under concrete laneway (mm) ||  ||  3000||  ||  ||  ||  || || | + | | colspan="2"|'''Minimum depth of excavations under concrete laneway (mm)''' ||  ||  3000||  ||  ||  ||  || || | 
| |- | |- | ||
| − | | colspan="2"| length of time for draining after storm event (>25mm) || max. 72 hr ||  || max.72 hr, 48 recommended ||  ||    ||    ||    || | + | | colspan="2"| '''length of time for draining after storm event (>25mm)''' || max. 72 hr ||  || max.72 hr, 48 recommended ||  ||    ||    ||    || | 
| |- | |- | ||
| − | | colspan="2"| Depth to high water table (m) || 1 ||  || 1 ||   ||    ||  ||   ||   |       | + | | colspan="2"| '''Depth to high water table (m)''' || 1 ||  || 1 ||   ||    ||  ||   ||   |       | 
| |- | |- | ||
| − | |  colspan="2"|Sand layer depth (mm) || |  ||150-300 ||  ||   ||  ||   ||  ||  | | + | |  colspan="2"|'''Sand layer depth (mm)''' || |  ||150-300 ||  ||   ||  ||   ||  ||  | | 
| |- | |- | ||
| − | |  colspan="2"|Subdrains Inlet pipes (mm) ||  || 100-200 ||  ||   ||   ||  ||  ||   | | + | |  colspan="2"|'''Subdrains Inlet pipes (mm)''' ||  || 100-200 ||  ||   ||   ||  ||  ||   | | 
| |- | |- | ||
| − | | colspan="2"|Overflow ( if infiltration rate ) ||  || < 15 mm/hr ||  ||  ||   ||  ||   ||   |   | + | | colspan="2"|'''Overflow ( if infiltration rate )''' ||  || < 15 mm/hr ||  ||  ||   ||  ||   ||   |   | 
| |- | |- | ||
| − | |  colspan="2"|Facilties reciving road runoff are not located within time of travel wellhead protection areas, year || 2 ||  || 2 ||  ||  ||  ||  ||  | | + | |  colspan="2"|'''Facilties reciving road runoff are not located within time of travel wellhead protection areas, year''' || 2 ||  || 2 ||  ||  ||  ||  ||  | | 
| |} | |} | ||
Revision as of 13:08, 26 September 2017
| LID Practice | CANADA | United States | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| Soakaways, Infiltration Trenches and Chambers | CVC+TRCA (Factsheets-2010)[1] | Toronto- 2016 | LID-SWM Guide 2010[2] | Massachusets SW BMP-2013 | District of Columbia-SWM Guidebook-2010 | W. Virginia-SWM design guidance manual-2012 | Pennsylvania-City of Philadelphia green St. design manual-2014 | Oregon SWM Manual-2014 | ||
| Setback from building Foundation(m) | 4 | 4 | ||||||||
| (Impervious drainage/treatment) area | 5:1-20:1, 10:1 recommended | 5:1-20:1, 10:1 recommended | CDA < 5 acres | CDA < 2 acres (T), < 5 acres (B) | < 2 acres | Max. load of 10:1 for infiltration systems (not specific to LID type) | CDA: max. 15000 ft2 | |||
| Natural Slope (%) | < 15 | < 15 | ||||||||
| A capped vertical sandpipe, perfored instaled to the bottom of the facility to monitor drainage time | 100-150 mm | 100-150 mm | ||||||||
| Filter Mdia | ||||||||||
| Stone Resvoir | 1.5" to 3" stone dia., 2" pea gravel above 6" sand below | 1.5"-3.5" stone dia. For stone layer, 3" layer of washed river stone, or No. 8 or 89 stone above, 6-8 " of sand below | Stone 1.5"-3.5" | Drain rock 3/4"-2.5 " washed open graded aggregate | ||||||
| Void space(%) | 30-40 | 30-40 | 30-40 | |||||||
| Granular material (clear stone)(mm) | 50 | 50 | 50 | |||||||
| Geotextile around the stone reservoirwith an overlap at the top | min. 300 mm | 300 | min. 300 mm | |||||||
| Bottom widh of excavations (mm) | 600-2400 | 600-2400 | 600-2400 | |||||||
| Minimum depth of excavations under concrete laneway (mm) | 3000 | |||||||||
| length of time for draining after storm event (>25mm) | max. 72 hr | max.72 hr, 48 recommended | ||||||||
| Depth to high water table (m) | 1 | 1 | ||||||||
| Sand layer depth (mm) | 150-300 | |||||||||
| Subdrains Inlet pipes (mm) | 100-200 | |||||||||
| Overflow ( if infiltration rate ) | < 15 mm/hr | |||||||||
| Facilties reciving road runoff are not located within time of travel wellhead protection areas, year | 2 | 2 | ||||||||