Difference between revisions of "Talk:Soakaways, Infiltration Trenches and Infiltration Chambers Guide"
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
| Line 8: | Line 8: | ||
| |- | |- | ||
| − | |colspan="2" |'''Setback from  | + | |colspan="2" |'''[[Setback from Building Foundation (m)]]''' | 
| | 4 ||  || 4 ||  ||  ||  ||    || | | 4 ||  || 4 ||  ||  ||  ||    || | ||
| |- | |- | ||
| − | |colspan="2"|'''(Impervious  | + | |colspan="2"|'''[[(Impervious Drainage/Treatment) Area]]''' | 
| |5:1-20:1, 10:1 recommended ||   || 5:1-20:1, 10:1 recommended ||CDA < 5 acres||CDA < 2 acres (T), < 5 acres (B)||< 2 acres || Max. load of 10:1 for infiltration systems (not specific to LID type)||CDA: max. 15000 ft2| | |5:1-20:1, 10:1 recommended ||   || 5:1-20:1, 10:1 recommended ||CDA < 5 acres||CDA < 2 acres (T), < 5 acres (B)||< 2 acres || Max. load of 10:1 for infiltration systems (not specific to LID type)||CDA: max. 15000 ft2| | ||
| |- | |- | ||
| − | |colspan="2"|  '''Natural Slope (%)''' || < 15 ||  || < 15 ||  ||  ||  ||  ||   | + | |colspan="2"|  '''[[Natural Slope (%)]]''' || < 15 ||  || < 15 ||  ||  ||  ||  ||   | 
| |- | |- | ||
| − | | colspan="2"|'''A capped vertical  | + | | colspan="2"|'''[[A capped vertical standpipe, perforated instaled to the bottom of the facility to monitor drainage time (mm)]]'''  || 100-150  ||  || 100-150  ||  ||  ||  ||  ||   | 
| |- | |- | ||
| − | | colspan="2"|'''Filter  | + | | colspan="2"|'''[[Filter Media]]'''   | 
| |- | |- | ||
| |colspan="2" style="text-align: right;|Stone Resvoir ||  ||  ||  || 1.5" to 3" stone dia., 2" pea gravel above 6" sand below || 1.5"-3.5" stone dia. For stone layer, 3" layer of washed river stone, or No. 8 or 89 stone above, 6-8 " of sand below || Stone 1.5"-3.5" ||  || Drain rock 3/4"-2.5 " washed open graded aggregate | |colspan="2" style="text-align: right;|Stone Resvoir ||  ||  ||  || 1.5" to 3" stone dia., 2" pea gravel above 6" sand below || 1.5"-3.5" stone dia. For stone layer, 3" layer of washed river stone, or No. 8 or 89 stone above, 6-8 " of sand below || Stone 1.5"-3.5" ||  || Drain rock 3/4"-2.5 " washed open graded aggregate | ||
| |- | |- | ||
| − | |colspan="2" style="text-align: right;| Void  | + | |colspan="2" style="text-align: right;| Void Space(%) || 30-40 || 30-40 || 30-40 ||  ||  ||  ||  ||   | 
| |- | |- | ||
| − | |colspan="2" style="text-align: right;| Granular  | + | |colspan="2" style="text-align: right;| Granular Material (clear stone)(mm) || 50 || 50 || 50 ||  ||  ||  ||  ||   | 
| |- | |- | ||
| − | |colspan="2" style="text-align: right;|Geotextile around the stone  | + | |colspan="2" style="text-align: right;|Geotextile around the stone reservoir with an overlap at the top (mm)  || min. 300  || 300 || min. 300  ||  ||  ||  ||  ||   | 
| |- | |- | ||
| − | | colspan="2"| '''Bottom  | + | | colspan="2"| '''[[Bottom Width of Excavations (mm)]]''' || 600-2400 || 600-2400 || 600-2400 ||  ||  ||  ||  ||   | 
| |- | |- | ||
| − | | colspan="2"|'''Minimum  | + | | colspan="2"|'''[[Minimum Depth of Excavations under concrete laneway (mm)]]''' ||  ||  3000||  ||  ||  ||  || || | 
| |- | |- | ||
| − | | colspan="2"| ''' | + | | colspan="2" style=" color:brown"| '''Length of Time for Draining after Storm Event (>25mm)'''   ||max. 72 hr.||   || max. 72 hr., 48 hr. recommended||   ||    ||     ||    || | 
| |- | |- | ||
| − | | colspan="2"| '''Depth to  | + | | colspan="2"| '''[[Depth to High Water Table (m)]]''' || 1 ||  || 1 ||   ||    ||  ||   ||   |       | 
| |- | |- | ||
| − | |  colspan="2"|'''Sand  | + | |  colspan="2"|'''[[Sand Layer Depth (mm)]]''' || |  ||150-300 ||  ||   ||  ||   ||  ||  |                       Length of Time for Draining after Storm Event (>25mm) | 
| |- | |- | ||
| − | |  colspan="2"|'''Subdrains Inlet  | + | |  colspan="2"|'''[[Subdrains Inlet Pipes (mm)]]''' ||  || 100-200 ||  ||   ||   ||  ||  ||   | | 
| |- | |- | ||
| − | | colspan="2"|'''Overflow  | + | | colspan="2"|'''[[Overflow is required when the infiltration rate equals]]''' ||  || < 15 mm/hr ||  ||  ||   ||  ||   ||   |   | 
| |- | |- | ||
| − | |  colspan="2"|''' | + | |  colspan="2"|'''[[Facilities receiving road runoff are not located within time of travel wellhead protection areas (years)]]''' || 2 ||  || 2 ||  ||  ||  ||  ||  | | 
| |} | |} | ||
Revision as of 10:04, 18 October 2017
| LID Practice | CANADA | United States | |||||||
|---|---|---|---|---|---|---|---|---|---|
| Soakaways, Infiltration Trenches and Chambers | CVC+TRCA (Factsheets-2010)[1] | Toronto- 2016 | LID-SWM Guide 2010[2] | Massachusets SW BMP-2013 | District of Columbia-SWM Guidebook-2010 | W. Virginia-SWM design guidance manual-2012 | Pennsylvania-City of Philadelphia green St. design manual-2014 | Oregon SWM Manual-2014 | |
| Setback from Building Foundation (m) | 4 | 4 | |||||||
| (Impervious Drainage/Treatment) Area | 5:1-20:1, 10:1 recommended | 5:1-20:1, 10:1 recommended | CDA < 5 acres | CDA < 2 acres (T), < 5 acres (B) | < 2 acres | Max. load of 10:1 for infiltration systems (not specific to LID type) | |||
| Natural Slope (%) | < 15 | < 15 | |||||||
| A capped vertical standpipe, perforated instaled to the bottom of the facility to monitor drainage time (mm) | 100-150 | 100-150 | |||||||
| Filter Media | |||||||||
| Stone Resvoir | 1.5" to 3" stone dia., 2" pea gravel above 6" sand below | 1.5"-3.5" stone dia. For stone layer, 3" layer of washed river stone, or No. 8 or 89 stone above, 6-8 " of sand below | Stone 1.5"-3.5" | Drain rock 3/4"-2.5 " washed open graded aggregate | |||||
| Void Space(%) | 30-40 | 30-40 | 30-40 | ||||||
| Granular Material (clear stone)(mm) | 50 | 50 | 50 | ||||||
| Geotextile around the stone reservoir with an overlap at the top (mm) | min. 300 | 300 | min. 300 | ||||||
| Bottom Width of Excavations (mm) | 600-2400 | 600-2400 | 600-2400 | ||||||
| Minimum Depth of Excavations under concrete laneway (mm) | 3000 | ||||||||
| Length of Time for Draining after Storm Event (>25mm) | max. 72 hr. | max. 72 hr., 48 hr. recommended | |||||||
| Depth to High Water Table (m) | 1 | 1 | |||||||
| Sand Layer Depth (mm) | 150-300 | Length of Time for Draining after Storm Event (>25mm) | |||||||
| Subdrains Inlet Pipes (mm) | 100-200 | ||||||||
| Overflow is required when the infiltration rate equals | < 15 mm/hr | ||||||||
| Facilities receiving road runoff are not located within time of travel wellhead protection areas (years) | 2 | 2 | |||||||