Difference between revisions of "Talk:Soakaways, Infiltration Trenches and Infiltration Chambers Guide"
Jump to navigation
Jump to search
Jenny Hill (talk | contribs) m (Jenny Hill moved page Soakaways, Infiltration Trenches and Infiltration Chambers Guide to Talk:Soakaways, Infiltration Trenches and Infiltration Chambers Guide without leaving a redirect: Take offline) |
|||
| (6 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
| − | {| class="wikitable | + | '''This page is an archive, please do not review, use or cite the contents below''' |
| + | |||
| + | {| class="wikitable" | ||
|- | |- | ||
| − | !colspan="2 | + | !colspan="2"| LID Practice |
| − | !colspan="3 | + | !colspan="3"|CANADA |
| − | !colspan="5 | + | !colspan="5"|United States |
|- | |- | ||
| − | !colspan="2 | + | !colspan="2"|Soakaways, Infiltration Trenches and Chambers|| CVC+TRCA (Factsheets-2010)<ref> http://www.creditvalleyca.ca/wp-content/uploads/2012/02/lid-swm-guide-apdxa-soakaways-infiltration-trenches-chambers.pdf</ref>|| Toronto- 2016 || LID-SWM Guide 2010<ref> http://www.creditvalleyca.ca/wp-content/uploads/2014/04/LID-SWM-Guide-v1.0_2010_1_no-appendices.pdf</ref>|| Massachusets SW BMP-2013 || District of Columbia-SWM Guidebook-2010 || W. Virginia-SWM design guidance manual-2012 || Pennsylvania-City of Philadelphia green St. design manual-2014 || Oregon SWM Manual-2014 |
|- | |- | ||
| − | |colspan="2" | | + | |colspan="2" |Setback from Building Foundation (m)|| 4 || || 4 || || || || || |
| − | | 4 || || 4 || || || || | ||
|- | |- | ||
| − | |colspan="2"| | + | |colspan="2"|(Impervious Drainage/Treatment) Area||5:1-20:1, 10:1 recommended || || 5:1-20:1, 10:1 recommended ||CDA < 5 acres||CDA < 2 acres (T), < 5 acres (B)||< 2 acres || Max. load of 10:1 for infiltration systems (not specific to LID type)||CDA: max. 15000 ft2| |
| − | |5:1-20:1, 10:1 recommended || || 5:1-20:1, 10:1 recommended ||CDA < 5 acres||CDA < 2 acres (T), < 5 acres (B)||< 2 acres || Max. load of 10:1 for infiltration systems (not specific to LID type)||CDA: max. 15000 ft2 | ||
|- | |- | ||
| − | |colspan="2"| | + | |colspan="2"|Natural Slope (%)|| < 15 || || < 15 || || || || || |
|- | |- | ||
| − | | colspan="2"| | + | | colspan="2"|A capped vertical standpipe, perforated installed to the bottom of the facility to monitor drainage time (mm)''' || 100-150 || || 100-150 || || || || || |
| − | |||
|- | |- | ||
| − | | colspan="2"| | + | | colspan="2"|[[Filter media]] |
|- | |- | ||
| − | |colspan="2" style="text-align: right;|Stone Resvoir || || || || 1.5" to 3" stone dia., 2" pea gravel above 6" sand below || 1.5"-3.5" stone dia. For stone layer, 3" layer of washed river stone, or No. 8 or 89 stone above, 6-8 " of sand below || Stone 1.5"-3.5" || || Drain rock 3/4"-2.5 " washed open graded aggregate | + | |colspan="2" style="text-align: right;|[[Stone Resvoir]]|| || || || 1.5" to 3" stone dia., 2" pea gravel above 6" sand below || 1.5"-3.5" stone dia. For stone layer, 3" layer of washed river stone, or No. 8 or 89 stone above, 6-8 " of sand below || Stone 1.5"-3.5" || || Drain rock 3/4"-2.5 " washed open graded aggregate |
|- | |- | ||
| − | |colspan="2" style="text-align: right;| Void | + | |colspan="2" style="text-align: right;| Void Space(%) || 30-40 || 30-40 || 30-40 || || || || || |
|- | |- | ||
| − | |colspan="2" style="text-align: right;| Granular | + | |colspan="2" style="text-align: right;| Granular Material (clear stone)(mm) || 50 || 50 || 50 || || || || || |
|- | |- | ||
| − | |colspan="2" style="text-align: right;|Geotextile around the stone | + | |colspan="2" style="text-align: right;|Geotextile around the stone reservoir with an overlap at the top (mm)|| min. 300 || 300 || min. 300 || || || || || |
| − | |||
|- | |- | ||
| − | | colspan="2"| | + | |colspan="2"|Bottom Width of Excavations (mm)|| 600-2400 || 600-2400 || 600-2400 || || || || || |
|- | |- | ||
| − | | colspan="2"| | + | |colspan="2"|Minimum Depth of Excavations under concrete laneway (mm)|| || 3000|| || || || || || |
|- | |- | ||
| − | | colspan="2"| | + | |colspan="2"|Length of Time for Draining after Storm Event (>25mm)||max. 72 hr.|| || max. 72 hr., 48 hr. recommended|| || || || || |
|- | |- | ||
| − | | colspan="2"| | + | |colspan="2"|Depth to High Water Table (m)|| 1 || || 1 || || || || || | |
|- | |- | ||
| − | | | + | |colspan="2"|Sand Layer Depth (mm)|| | ||150-300 || || || || || || |Length of Time for Draining after Storm Event (>25mm) |
|- | |- | ||
| − | | | + | |colspan="2"|Subdrains Inlet Pipes (mm)|| || 100-200 || || || || || || | |
|- | |- | ||
| − | | colspan="2"| | + | |colspan="2"|Overflow is required when the infiltration rate equals|| || < 15 mm/hr || || || || || || | |
|- | |- | ||
| − | | | + | |colspan="2"|Facilities receiving road runoff are not located within time of travel wellhead protection areas (years)|| 2 || || 2 || || || || || | |
| − | |||
|} | |} | ||
Latest revision as of 17:42, 18 March 2018
This page is an archive, please do not review, use or cite the contents below
| LID Practice | CANADA | United States | |||||||
|---|---|---|---|---|---|---|---|---|---|
| Soakaways, Infiltration Trenches and Chambers | CVC+TRCA (Factsheets-2010)[1] | Toronto- 2016 | LID-SWM Guide 2010[2] | Massachusets SW BMP-2013 | District of Columbia-SWM Guidebook-2010 | W. Virginia-SWM design guidance manual-2012 | Pennsylvania-City of Philadelphia green St. design manual-2014 | Oregon SWM Manual-2014 | |
| Setback from Building Foundation (m) | 4 | 4 | |||||||
| (Impervious Drainage/Treatment) Area | 5:1-20:1, 10:1 recommended | 5:1-20:1, 10:1 recommended | CDA < 5 acres | CDA < 2 acres (T), < 5 acres (B) | < 2 acres | Max. load of 10:1 for infiltration systems (not specific to LID type) | |||
| Natural Slope (%) | < 15 | < 15 | |||||||
| A capped vertical standpipe, perforated installed to the bottom of the facility to monitor drainage time (mm) | 100-150 | 100-150 | |||||||
| Filter media | |||||||||
| Stone Resvoir | 1.5" to 3" stone dia., 2" pea gravel above 6" sand below | 1.5"-3.5" stone dia. For stone layer, 3" layer of washed river stone, or No. 8 or 89 stone above, 6-8 " of sand below | Stone 1.5"-3.5" | Drain rock 3/4"-2.5 " washed open graded aggregate | |||||
| Void Space(%) | 30-40 | 30-40 | 30-40 | ||||||
| Granular Material (clear stone)(mm) | 50 | 50 | 50 | ||||||
| Geotextile around the stone reservoir with an overlap at the top (mm) | min. 300 | 300 | min. 300 | ||||||
| Bottom Width of Excavations (mm) | 600-2400 | 600-2400 | 600-2400 | ||||||
| Minimum Depth of Excavations under concrete laneway (mm) | 3000 | ||||||||
| Length of Time for Draining after Storm Event (>25mm) | max. 72 hr. | max. 72 hr., 48 hr. recommended | |||||||
| Depth to High Water Table (m) | 1 | 1 | |||||||
| Sand Layer Depth (mm) | 150-300 | Length of Time for Draining after Storm Event (>25mm) | |||||||
| Subdrains Inlet Pipes (mm) | 100-200 | ||||||||
| Overflow is required when the infiltration rate equals | < 15 mm/hr | ||||||||
| Facilities receiving road runoff are not located within time of travel wellhead protection areas (years) | 2 | 2 | |||||||