| Line 38: |
Line 38: |
| | |Drainage Area | | |Drainage Area |
| | |Sustaining vegetation, volumetric turnover | | |Sustaining vegetation, volumetric turnover |
| − | |5 Ha (≥10 Ha preferred) | + | |style="text-align: left|5 Ha (≥10 Ha preferred) |
| | |- | | |- |
| | |Treatment Volume | | |Treatment Volume |
| | |Provision of appropriate level of protection (Table 3.2) | | |Provision of appropriate level of protection (Table 3.2) |
| − | |See Table 3.2 | + | |style="text-align: left|See Table 3.2 |
| | |- | | |- |
| | |Active Storage | | |Active Storage |
| | |Detention | | |Detention |
| − | |Suspended solids settling 24 hrs (12 hrs if in conflict with min. orifice size) | + | |style="text-align: left|Suspended solids settling 24 hrs (12 hrs if in conflict with min. orifice size) |
| | |- | | |- |
| | |Forebay | | |Forebay |
| | |Pre-treatment | | |Pre-treatment |
| − | | | + | |style="text-align: left| |
| | #Minimum depth: 1 m; | | #Minimum depth: 1 m; |
| | #Sized to ensure non-erosive velocities leaving forebay; | | #Sized to ensure non-erosive velocities leaving forebay; |
| Line 63: |
Line 63: |
| | |Permanent Pool Depth | | |Permanent Pool Depth |
| | |Vegetation requirements, rapid settling | | |Vegetation requirements, rapid settling |
| − | |The average permanent pool depth should range from 150 mm to 300 mm | + | |style="text-align: left|The average permanent pool depth should range from 150 mm to 300 mm |
| | |- | | |- |
| | |Active Storage Depth | | |Active Storage Depth |
| | |Storage/flow control, sustaining vegetation | | |Storage/flow control, sustaining vegetation |
| − | |Maximum 1.0m for storms < 10 year event | + | |style="text-align: left|Maximum 1.0m for storms < 10 year event |
| | |- | | |- |
| | |Side Slopes | | |Side Slopes |
| | |Safety | | |Safety |
| − | | | + | |style="text-align: left| |
| | #5:1 For 3 m above and below permanent pool; | | #5:1 For 3 m above and below permanent pool; |
| | #Maximum 3:1 elsewhere | | #Maximum 3:1 elsewhere |
| Line 77: |
Line 77: |
| | |Inlet | | |Inlet |
| | |Avoid clogging/freezing | | |Avoid clogging/freezing |
| − | | | + | |style="text-align: left| |
| | #Minimum 450 mm; | | #Minimum 450 mm; |
| | #Preferred pipe slope: >1%; | | #Preferred pipe slope: >1%; |
| Line 84: |
Line 84: |
| | |Outlet | | |Outlet |
| | |Avoid clogging/freezing | | |Avoid clogging/freezing |
| − | | | + | |style="text-align: left| |
| | #Minimum: 450mm outlet pipe; | | #Minimum: 450mm outlet pipe; |
| | #Preferred pipe slope: >1%; | | #Preferred pipe slope: >1%; |
| Line 92: |
Line 92: |
| | |Maintenance Access | | |Maintenance Access |
| | |Access for backhoes or dredging equipment | | |Access for backhoes or dredging equipment |
| − | | | + | |style="text-align: left| |
| | #Provided to approval of Municipality; | | #Provided to approval of Municipality; |
| | #Provision of maintenance drawdown pipe preferred | | #Provision of maintenance drawdown pipe preferred |
| Line 98: |
Line 98: |
| | |Buffer | | |Buffer |
| | |Safety | | |Safety |
| − | |Minimum 7.5 m above maximum water quality/erosion control water level | + | |style="text-align: left|Minimum 7.5 m above maximum water quality/erosion control water level |
| | |} | | |} |
| | | | |